Category:Status: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Replaced content with " Category:Organization")
 
(17 intermediate revisions by 4 users not shown)
Line 1: Line 1:
=Introduction=


Here is the present status, as of Feb. 7, 2009 - a 2 month plan. See the status of individual projects below.


[[Image:020709status.jpg]]
[[Category:Organization]]
 
 
The 2 month tasks are:
 
*We are now finishing the [[Babington Burner]] application to the hybrid masonry stove. Marcin is project leader.
*[[LifeTrac]] upgrades involve larger motor mount bolts, a one day task.
*Vegetable Plan needs to be outlines for raised bed chinampa system. We can make reaised beds with various scrap material from on-site.
*Metal melt-down of old industrial detritus scrap, such as broken tractors replaced by [[LifeTrac]] could be our first major political statement - if we develop the metal melting furnace. This is a high priority items, needs project leader.
*Torch table needs to be built, design is in review.
*Lathe required a day to draw up in 3D, and is to be in-sourced to [[True Fans]].

Latest revision as of 17:24, 18 July 2011