Category:Status: Difference between revisions
Jump to navigation
Jump to search
Line 15: | Line 15: | ||
*Lathe required a day to draw up in 3D, and is to be in-sourced to [[True Fans]]. | *Lathe required a day to draw up in 3D, and is to be in-sourced to [[True Fans]]. | ||
*[[Nathan]] is working on the [[Solar Microhut]] design | *[[Nathan]] is working on the [[Solar Microhut]] design | ||
*[[Steam Engine Construction Set]] needs work. Engine design work is not yet complete as of 2.7.09. | |||
*[[MicroTrac]] needs to be designed. We're presently looking at building it, with a 12-15 hp off-shelf diesel engine. We will have chipper, tiller, mower, and baler attachement. |
Revision as of 19:08, 7 February 2009
Introduction
Here is the present status, as of Feb. 7, 2009 - a 2 month plan. See the status of individual projects below.
The 2 month tasks are:
- We are now finishing the Babington Burner application to the hybrid masonry stove. Marcin is project leader.
- LifeTrac upgrades involve larger motor mount bolts, a one day task.
- Vegetable Plan needs to be outlines for raised bed chinampa system. We can make reaised beds with various scrap material from on-site.
- Metal melt-down of old industrial detritus scrap, such as broken tractors replaced by LifeTrac could be our first major political statement - if we develop the metal melting furnace. This is a high priority items, needs project leader.
- Torch table needs to be built, design is in review.
- Lathe required a day to draw up in 3D, and is to be in-sourced to True Fans.
- Nathan is working on the Solar Microhut design
- Steam Engine Construction Set needs work. Engine design work is not yet complete as of 2.7.09.
- MicroTrac needs to be designed. We're presently looking at building it, with a 12-15 hp off-shelf diesel engine. We will have chipper, tiller, mower, and baler attachement.
Pages in category "Status"
The following 14 pages are in this category, out of 14 total.