Backhoe 3/Research Development: Difference between revisions
Jump to navigation
Jump to search
(→Status) |
(→Status) |
||
Line 3: | Line 3: | ||
=Status= | =Status= | ||
In 2012, OSE started the Backhoe 2 (Deep Dig) redesign. The goals of the | In 2012, OSE started the Backhoe 2 (Deep Dig) redesign. In Oct 2013 we're finishing the redesign and doing a new build, docs, etc. | ||
=Design Boards= | |||
* [https://docs.google.com/spreadsheet/ccc?key=0ArpE5Y9PpJCXdGJWeWpsY05jRDVlcGFXangyYlo2Y1E#gid=1 Overall Development Board] | |||
* TODO Pivot Module Development Board | |||
=Requirements= | |||
The goals of the backhoe 2 are: | |||
* to have an increased range of motion, | * to have an increased range of motion, | ||
* to use the standard [[Warehouse]] parts as much as possible, and | * to use the standard [[Warehouse]] parts as much as possible, and | ||
* to use the Bobcat | * to use the [[Bobcat Standard Quick Attach]] to attach to the LifeTrac 6. | ||
=See Also= | |||
* [[Lenny-Wayne]] as as [[Guest Collaborative Production Director]] was working on the [[GrabCAD Backhoe Redesign for Fabrication]] with [[Aaron]] as project manager. | * Oct 2013: [[Dan Log]], [[Cody Log]], [[Marcin Log]], and [[James Log]]. | ||
* Oct 2012: [[Lenny-Wayne]] as as [[Guest Collaborative Production Director]] was working on the [[GrabCAD Backhoe Redesign for Fabrication]] with [[Aaron]] as project manager. | |||
* [[Brian Log]]. | * [[Brian Log]]. | ||
* [[Backhoe Log]]. | * [[Backhoe Log]]. |
Revision as of 22:34, 9 October 2013
Backhoe 3 | ||
---|---|---|
Home | Research & Development | Bill of Materials | Manufacturing Instructions | User's Manual | User Reviews | ![]() |
Status
In 2012, OSE started the Backhoe 2 (Deep Dig) redesign. In Oct 2013 we're finishing the redesign and doing a new build, docs, etc.
Design Boards
- Overall Development Board
- TODO Pivot Module Development Board
Requirements
The goals of the backhoe 2 are:
- to have an increased range of motion,
- to use the standard Warehouse parts as much as possible, and
- to use the Bobcat Standard Quick Attach to attach to the LifeTrac 6.
See Also
- Oct 2013: Dan Log, Cody Log, Marcin Log, and James Log.
- Oct 2012: Lenny-Wayne as as Guest Collaborative Production Director was working on the GrabCAD Backhoe Redesign for Fabrication with Aaron as project manager.
- Brian Log.
- Backhoe Log.
- GrabCAD Backhoe Redesign for Fabrication.
Designs
- OSE Oct 2013 redesign is using File:Backhoe deep dig.skp.
- OSE Side by side hydraulic design based on small ditch witch design. File:Backhoe sidebyside2.skp
- Oily Hands has a huge list of diggers people have built themselves
- this guy has a fully documented build process for his
- Ubuildit Plans has a backhoe design that's about as simple as one can possibly get.
- Pivot rotation using scissor motion and 14" cylinder File:Backhoe sidebyside8.skp.
- Other versions of the Backhoe.