No edit summary |
|||
Line 11: | Line 11: | ||
*[[LifeTrac]] upgrades involve larger motor mount bolts, a one day task. | *[[LifeTrac]] upgrades involve larger motor mount bolts, a one day task. | ||
*Vegetable Plan needs to be outlines for raised bed chinampa system. We can make reaised beds with various scrap material from on-site. | *Vegetable Plan needs to be outlines for raised bed chinampa system. We can make reaised beds with various scrap material from on-site. | ||
*Metal melt-down of old industrial detritus scrap, such as broken tractors replaced by [[LifeTrac]] could be our first major political statement - if we develop the metal melting furnace. This is a high priority | *Metal melt-down of old industrial detritus scrap, such as broken tractors replaced by [[LifeTrac]] - could be our first major political statement - if we develop the metal melting furnace [[Foundry]]. This is a high priority item, '''needs project leader'''. | ||
*[[Torch Table]] needs to be built, 3D design is in review. | *[[Torch Table]] needs to be built, 3D design is in review. | ||
*[[Lathe]] required a day to draw up in 3D, and is to be in-sourced to [[True Fans]]. | *[[Lathe]] required a day to draw up in 3D, and is to be in-sourced to [[True Fans]]. | ||
Line 17: | Line 17: | ||
*[[Steam Engine Construction Set]] needs work. Engine design work is not yet complete as of 2.7.09. | *[[Steam Engine Construction Set]] needs work. Engine design work is not yet complete as of 2.7.09. | ||
*[[MicroTrac]] needs to be designed. We're presently looking at building it, with a 12-15 hp off-shelf diesel engine. We will have chipper, tiller, mower, and baler attachement. | *[[MicroTrac]] needs to be designed. We're presently looking at building it, with a 12-15 hp off-shelf diesel engine. We will have chipper, tiller, mower, and baler attachement. | ||
*Site Plan - permacultural design of entire facility needs to be drawn out, including 30 connected [[Solar Microhut]]s. |
Revision as of 19:19, 7 February 2009
Introduction
Here is the present status, as of Feb. 7, 2009 - a 2 month plan. See the status of individual projects below.
The 2 month tasks are:
- We are now finishing the Babington Burner application to the hybrid masonry stove. Marcin is project leader.
- LifeTrac upgrades involve larger motor mount bolts, a one day task.
- Vegetable Plan needs to be outlines for raised bed chinampa system. We can make reaised beds with various scrap material from on-site.
- Metal melt-down of old industrial detritus scrap, such as broken tractors replaced by LifeTrac - could be our first major political statement - if we develop the metal melting furnace Foundry. This is a high priority item, needs project leader.
- Torch Table needs to be built, 3D design is in review.
- Lathe required a day to draw up in 3D, and is to be in-sourced to True Fans.
- Nathan is working on the Solar Microhut design
- Steam Engine Construction Set needs work. Engine design work is not yet complete as of 2.7.09.
- MicroTrac needs to be designed. We're presently looking at building it, with a 12-15 hp off-shelf diesel engine. We will have chipper, tiller, mower, and baler attachement.
- Site Plan - permacultural design of entire facility needs to be drawn out, including 30 connected Solar Microhuts.