Here is the present status, as of Feb. 7, 2009 - a 2 month plan. See the status of individual projects below.

020709status.jpg


The 2 month tasks are:

  • We are now finishing the Babington Burner application to the hybrid masonry stove. Marcin is project leader.
  • LifeTrac upgrades involve larger motor mount bolts, a one day task.
  • Vegetable Plan needs to be outlines for raised bed chinampa system. We can make reaised beds with various scrap material from on-site.
  • Metal melt-down of old industrial detritus scrap, such as broken tractors replaced by LifeTrac could be our first major political statement - if we develop the metal melting furnace. This is a high priority items, needs project leader.
  • Torch Table needs to be built, 3D design is in review.
  • Lathe required a day to draw up in 3D, and is to be in-sourced to True Fans.
  • Nathan is working on the Solar Microhut design
  • Steam Engine Construction Set needs work. Engine design work is not yet complete as of 2.7.09.
  • MicroTrac needs to be designed. We're presently looking at building it, with a 12-15 hp off-shelf diesel engine. We will have chipper, tiller, mower, and baler attachement.