Audrey Log

From Open Source Ecology
Revision as of 20:25, 17 May 2013 by Marcin (talk | contribs)
Jump to navigation Jump to search

Fri May 17, 2013

Thurs May 16, 2013

Wed May 15, 2013

  • Creating 6 in 60 FAQ and worked on Google Hangout Instructional
  • Wrote Design Sprint #2 Invitation -- emailed to 500 contributors/true fans; NOTE: was locked out of email due to large # of emails sent, need to ensure account allows for max of 2000/day
    • Would like to research listserv
    • Would like to develop a link to allow true fans/contributors/etc the opportunity to choose what type of information they receive: newsletters, program updates & campaign information, special events/announcements, other categories?
  • Consolidated true fans/contributor lists to one--deleted multiple entries of the same email OSE Consolidated Email Contact List (internal document)

Tues May 14, 2013

Mon May 13, 2013

  • Built OSE Parking Lot
  • Received inquiry from Maris Ozinga--mech engineer student in Holland who would like to use a GVCS product as part of a student project; would like to collaborate with us. Need to establish processes for remote projects/remote student projects--perhaps similar to that set up for DPVs?
  • Sent application to Ameren to establish 400 amp backup service; confirmed 400 amp option w/electrician. Electrician to come out to OSE Tues, 14 May to survey power requirements in workshop at 1pm. OSE Grid Backup / Returning Power to the Grid Planning Log
  • Creating standardized DPV Interview process
  • Setting up Microhouse Planning page
  • Video conferenced with Jordan Phoenix re: DPV this summer
  • Creating The Spark Film -- 1 Day Planning Log
  • Building Contributor Touch Points model
  • Found possible open/high bed frame from Ikea for Hab Lab sleepers-- http://www.ikea.com/us/en/catalog/products/20180566/ or http://www.ikea.com/us/en/catalog/products/40177520/ - researching cost with shipping and measuring bed frame/beds; under bed drawer here: http://www.ikea.com/us/en/catalog/products/20238223/
  • Notes to self--(1) Update log from last Wed & Thurs!!! (2) Develop instructions/documentation for logging in/connecting via Google Hang Out using OSE Community; (3) Develop agenda for beginning of Design Sprints to be able to "Screen Share" referenced pages during Marcin's welcome/intro speech; (4) Update Master Schedule, test sharing mechanism on Google+ with Gary; insert place holder for OSE Execs after 13 Jul; (5) Create non-technical survey for volunteers; (6) Research touch points for additional recruiting mechanisms both locally and other; include corporations (7) Draft letter to request for receipt of goods from local businesses; (8) OSE polos or button downs??? other? (9) Need to begin to think about DPV/volunteer mid-term survey, exit survey and volunteer appreciation program

Sun May 12, 2013

  • Contacted OSE Europe chapters for a video conference to integrate OSE Europe communities in the 6 in 60 Campaign

Sat May 11, 2013

Task Update

Fri May 10, 2013

Task Update

  • Created survey for 6 in 60 Design Sprint Tech Check Extreme Manufacturing - 6 in 60 - Design Sprint #1
  • Added links and events to the Open Source Ecology "6 in 60" Campaign Google+ community; created two guest login IDs for the community
  • Tested gotomeeting.com with Rob, we will evaluate this as a possible option for collaboration in the future
  • Continued effort to set up electricity--completed Ameren application and spoke with Joe (electrician); quote is in work; discussed timeline/need date; Joe will check on parts availability to meet our deadline
  • Need to connect with OSE Europe leaders in Italy, Greece, Germany, etc and try to work on parallel/conjoining events
  • Created youtube channel (AudreyOSE) to allow us to record Google Hangout sessions that are broadcasted


Thurs May 9, 2013

Task Update

Wed May 8, 2013

Task Update

Tues May 7, 2013

Task Update

  • Updated Master Schedule
  • Developing a list: DPV/Intern Prep -- Needs List for DPVs. What do we need to buy before their arrival, what should we tell them to bring?
  • Developing 2013 DPV / Intern Tracker to track task completion of DPV/Internship Process
  • Discussed electricity options with Joe & Marcin--waiting for quote from Joe (electrician) for costs of 800 amp power; ETA Wed 8 May COB
  • Need to create an OSE "parking lot" process to "park" ideas and roll them into the schedule
  • Pulling potential contributors' contact info from Team Culturing list; received event announcement from Marcin for '6 in 60' campaign

Mon May 6, 2013

Task Update:

  • Attempted to load Gantt chart to wiki; its opening with errors
  • Worked OSE Jam team matrix and reviewed schedule with Marcin; decided to build schedule based upon modules first, then build an integration point into the schedule
  • Mapped out 20 modules (with Marcin) to be created for the Sweet 6 Sprint; discussed time/formats of sprints--possible expansion of sprints to 3 time zones in the future with facilitators in each time zone

Sun May 5, 2013

Task Update:

  • Showed my mom (who is not tech savvy) how to use Sketchup; she's volunteered to watch the tutorial, perform the cube test, and report the results

Fri May 3, 2013

Task Update:

However, my computer is not downloading the program--unknown reason. Reviewed security settings--gtg. Will attempt in another browser. After clearing space in my download file, I was able to install the required software. Success! However, am putting 3D printing on hold to focus on setting up DPVs for the summer.

  • Need to establish DPV processes:
    • Survey
    • Wiki log creation & video of interest
    • DPV link -- update FAQs, other info
    • Develop comm protocols: interview, notification, announcement/blog spot, send "welcome" info: community standards, shop safety guidelines, what to bring, about FeF/Maysville, etc...other? Work with Gary to establish objectives/goals for visit--align with OSE Master Schedule; ID resources needed to support DPV ($, manpower, facilities, tools/equipment).
  • Launched Sweet 6 Survey, if approved, would like to send out to past volunteers and post to our "events" section on our website.
  • Met with Gary. Discussed: facility issues requiring immediate, short term and mid-term attention. Discussed advertising ideas for upcoming campaign/recruitment protocols, screening processes, DPV pages, and pre-boarding of interns/DPVs. Also, need to include website organization/efficiency modeling in the Master Schedule.
  • Developing DPV survey & editing requirements for the DPV page. Will have this done this weekend, as well as some other products to send to DPVs and edits to the info submitted by DPVs. Made initial contact with 3 potential DPVs this summer. Note: would be nice to have a video about DPVs! 30 sec-1 min "commercial" shot--what it is, what you can do, how to apply. Also believe we should link DPV info under "Events" on the Main Page--or find a better place???
  • Posted link to Sweet 6 Campaign survey in the Control Panel for the Microtrac page - OSHW-OSE-Microtractor-v2

Thurs May 2, 2013

Task Update:

  • Organized/cleaned office at FeF; created a space for the 3D printer. Put together the 3D printer. Encountered issues with www.LulzBot.com download procedures. Calling tech support to resolve--drivers not found, no GUI? Really need to consider a LAN line or VOIP line at FeF...can't get a signal while plugged into 3D printer.
  • Recommending GanttProject for use as scheduling tool. It allows users to: 1) Create WBS, draw dependencies, define milestones; 2) Resource load the schedule; 3) Develop PERT charts, 4) Export as PNG, PDF, or HTML. 5) Import/export from MS Project, 6) Share via WebDAV, 7) Is open source & free. (This page needs work--am learning how to embed video, etc).
  • Developing notional Master Schedule.
  • Testing Jam Team Survey functionality.
  • Received DPV info from Marcin, will begin screening process Fri, 3 May.
  • Began making changes to Audrey Control Sandbox. Ideas: 1) Develop 30 sec video advertising upcoming Product Drive (call it the Live Free Campaign?)--include what we are doing, key events timeline, who we need, logistics (web conferencing, prototype builds, etc); 2) Develop 30 sec video advertising DPVs; then develop 2-4 min video showing FeF, DPV FAQs, highlights, etc?

Wed May 1, 2013

Task Update:

  • Met with Gary to discuss: Jam Team Design (preliminary), questionnaire, dedicated project visit info & master schedule.
  • Began outlining a notional master schedule.
  • Updated "Google Survey" project to include how to change the order of questions and make certain questions mandatory.
  • Tested multiple Gantt chart programs for schedule development.

Tue Apr 30, 2013

(1) Take Team Culturing Survey and do the Recruiting Survey to begin generating a database. (2) Draft an invitation for a Design Sprint - May 10-11 (3) Download Ubuntu as a dual boot system. Follow directions from Gary - Gary_Log#Tuesday_April_16_2013 - download 12.04 LTS (Long Term Support). (4) Start emailing people to begin generating Database of Contributorials. (5) Do Matrix of roles for OSE Development Events - put it up at Creating OSE Jam Team Design. (6) Check out Dedicated Project Visit. (7) Scheduling software -Gantt_Chart_Template_for_OpenOffice_Calc. Check Osalt. (8) For 3D printing - begin printing 1/2" square tubing equivalent of 4x4" tubing with " holes every 4". Google Sketchup has a plugin for STL files - Sketchup Conversion to STL

Task Update:

  • Continued working on the questionnaire in the morning, then met up with Gary and Elliot and spent the remaining day at FeF helping Gary in the shop. Lots of progress has been made since I first saw it--let the organizing begin!
  • I opened the 3D printer and read through the instructions--realized I will likely need more than 1 hour--will return to FeF Thurs morning (2 May) to knock out this project.
  • Made some additional notes wrt "How to Create a Google Survey" process and will update on Wed, 1 May.
  • Rough outlined a Master Schedule, researched open source Gantt chart programs.
  • Made some notes re: Dedicated Project Visit site--will discuss with Gary & Marcin and make some updates.
  • Downloaded Ubuntu.

Mon Apr 29, 2013

Tasks - (1) Download Sketchup - follow the tutorial and build an actual cube - first See Sketchup Tutorial Box at OSHW-OSE-CNC_Torch_Table-v2. Please post your results at: Sketchup Cube Test. (2) Create a sample Control Panel for projects - Audrey Control Panel Sandbox. Put in a YouTube of your choice into the first window, while the changing the text and link to the corresponding value. Put in a Google spreadsheet of your choice into window 7. (3) Create a Google Drawing showing all the types of people that we are inviting to the Development Sprint. See the OSE Jam which talks about the people required. Put up your Graphic at OSE Jam Team Design. (4) Document how to build a Google Form at How to Create a Google Survey. Design a Google Form for Team Recruiting Form - specifically for 4th of July Campaign of the Sweet 6 - or 6 prototypes designed and built by July. Planning for an agile Sprint - which a Hackathon where everyone works together on a common goal. Put up your resulting Google Form up at the Control Panel for the Microtrac page - OSHW-OSE-Microtractor-v2. Include Documenters as one of the particular groups involved to fill in OSE OManual Documentation realtime. Put up your sample survey design at Tech Team Culturing Survey. See also the LifeTrac Construction Set Script.

Task Update:

  • Completed Sketchup download, tutorials, and test. Posted notes, lessons learned and product at Sketchup Cube Test.
  • Completed draft documentation on how to build a Google Form at How to Create a Google Survey. Will finalize once survey is complete.
  • Began creation of Google Form for a Team Recruiting Survey. Reviewed past surveys, drafted questions. Among other things, requesting information about involvement in social media (Facebook, LinkedIn, Twitter).
  • Began reviewing requirements for Jam Team--need more guidance: purpose, what type of tool is this (pictorial, informational, etc); drafted personnel requirements/expertise overview--product designers, mechanical engineers, documenters, CAD designer, animator, digital/flexible fabricator, other?

Older Entries