Marcin Log - September 2014
Contents
Tue Sep 23, 2014
Sun Sep 21, 2014
How to Make Instructionals from a Script and Sketchup. This week put in 4 freeze proof water hydrants, trenched water to MicroHouse 3 and 4, trenched power to MicroHouse 4, moved all bricks to work site, leveled ground for brick floor, moved CEB rollers and machine over, and installed ridge beam for MicroHouse 4. Pressing bricks next week for outdoor patio and floor. Working on MicroHouse 4 Hydronic System Design and Build.
Sun Sep 14, 2014
Fri Sep 12, 2014
Poured foundation - MicroHouse_4_Foundation_-_Build_Pictures. MicroHouse 4 Design Sprint. Extreme Design Build.
Thu Sep 11, 2014
Admin Tasks filling.
Wed Sep 10, 2014
Sun Sep 7, 2014
MicroHouse 4 Utilities - water and electrical connection coming in week of the 15th. MicroHouse 4 Foundation.
Sat Sep 6, 2014
Continuing parallel development strategy for MicroHouse Interior Walls. Collaboration Criteria. Jae Sabol - One Community.
Fri Sep 5, 2014
MicroHouse 4 Bathroom Requirement. Technical Review. Press Releases. OSE Email List.
Thu Sep 4, 2014
Continuing MicroHouse Interior Walls. Creating Torching Instructional
Wed Sep 3, 2014
CEB_Controller_Automation. Filling in MicroHouse 4 Workshop participant. OSE Strategy. Machining Skills. Farmbot. Continuing Operations Requirements.
Tue Sep 2, 2014
Top US permaculture - Mike Shapard, Greg Judy, Paul Wheaton, Peter Bane, Michael Polarski
Mon Sep 1 2014
Filing 2014 Corporate Registration Report. Power Cube Troubleshooting Instructions. Cooperation. Troy Martz Gasifier. Hydronic_Heat_Circuit_Diagram.