Seed Home 2 Utility Panel: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 34: | Line 34: | ||
|data5 = Bath, sink, and washer traps are prebuilt into foundation | |data5 = Bath, sink, and washer traps are prebuilt into foundation | ||
|header6 = | |header6 = | ||
|label6 = | |label6 = Power/Gas Panel | ||
|data6 = | |data6 = Accepts gas meter, power meter, and interior breaker panel. | ||
|header7 = | |header7 = | ||
|label7 = Construction | |label7 = Construction |
Revision as of 18:48, 5 October 2020
|
Development
Concept
Technical
Part Library
Visual History:
Error creating thumbnail: File missing
Error creating thumbnail: File missing
Gallery:
- Error creating thumbnail: File missing
Utility Gas Meter. - FreeCAD - File:Gasmeter.FCStd
- Error creating thumbnail: File missing
Utility Power Meter. - FreeCAD - File:Powermeter.FCStd
More
- Sewer connection has 3 fees: one is excavation, 2 is permit, 3 is connection fee - which can be from $300 to $20k. Sewer near flint - [1] costs $3k for connection. Connection to sewer in Salem, Il - [2] - $300. An incinerating toilet becomes a good idea - Incinerating toilet - [3] only $2k