To-Do List for User: Eric: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Added a Category to the Page)
(Moved some content to a more fitting page)
Line 1: Line 1:
=Basics=
=Basics=
*This is the [[Personal To-Do List]] for [[User: Eric]]
*This is the [[Personal To-Do List]] for [[User: Eric]]
=To-Do's=
*Stuff on Business / Advertising Ethics
*Finish up the remaining "missing parts" in the
**[[Bio-Petrochemistry]] category
**[[Pollution]] category
*Start + Finish (mostly, not going to "end it" obiously) the [[Precision Agriculture]] and [[Controlled Enviroment Agriculture]] categories to finish those mainly in prepreation of a [[Farmbot]] (or [[Universal Axis]] based adaptation) in a future [[Community Garden]]
**Also include developments on Scihouse Inc on the [[PBR]] work, as it can fit in this category (algaculture can get a category of it's own once it grows sufficiently), and is relevant to the bio-petchem stuff being done (here and on scihouse)
*Tie up all "loose ends", interlink [[Orphan Pages]] ,  complete [[Incomplete Pages]] , and just clean up all that as much as possible
**Also need to discuss/work with the code-skilled people in the discord (and anyone else intrested!) on if the wiki can be fixed/updated, or even a "ai-editor" that is a user account to make this at least semi-automated, and thus less labor intensive saving dev hours for other projects
**This also makes the wiki less "labrynth-ey" / like the [[Library of Babel]] ,  and moreso something that people can "dive into" without needing a "sherpa" of sorts
*Interconnect [[Scihouse Inc]] , [[Precious Plastic]] , and [[Open Source Low Tech]] with the wiki more
**Granted i/we? don't want to make this into some frankenstinian mess, so caution + group planning needed, but there is a huge ammount of [[Redundancy Waste]] via lack of a common "information bank" and thus a huge ammount of wasted dev efforts in making 5+ [[Filament Maker]] designs, 3+ [[Shredder]] Designs, etc (my estimation by the way, data + connecting in the works)
*Finish out all the "figuring out the big pucture stuff" like all the [[Scale]] related, huge named pages, and all that zoomed out "meta" stuff
* '''Once that mess is done'''
**Time estimate (that as with nearly all of these will be off somehow (too far/not far enough ahead, but i digress) is ~1-2 weeks? (assuming no major unplanned events like a covid outbreak, sudden trip somewhere etc on my side)
* '''THEN move on to:'''
**Create/Develop more "Concrete Plans" on the [[Fleming Island Makerspace]] , mainly:
***Exact list of "needed things" + [[BOM]] for that "low impact, early phase" (about 1/2 done now already?)
***More powerpoints + spreadsheets on planned budgets/business models for making it presentable, not just "MAKERSPACE HYPE AND IDEAS" ,  but "Here is my proposal for an expansion of program "x" in a similar manner to the 20XX expansion of location "y's" program.  The preliminary analysis shows an estimated budget..." all in nice folders and a presentation + email drafts / templates
***Drawings of Internal Layouts/Organization (what drawers where for the EARLY stuff, but just to keep it orderly, pegboards and all that), Drawings/GIS overlays of where [[Community Gardens]] could go, where [[VAWTs]] could go (can be used as [[Kinetic Art]] and an "attention grabber" as well as a renewable power source, for example), where a LONG TERM building expansion/shed even could go etc
****Then even more long term make OBI plans + models to show off for "phase two implementation proposals" etc
* '''AFTER/BEFORE/AT THE SAME TIME AS ALL THIS'''
**Figure out state of recent [[OBI]] work completion
**Figure out local zoning, and document it to aid in planning
**Figure out how one would collaborate with [[Habitat for Humanity]] (how far to "go in" ie entire house vs just tools vs heavy equipment like a construction aimed [[Lifetrac]] and pr risk/monetary cost (or gain!) for all this
**Then make the same level of presentations and "stuff" outlined in the above makerspace bit
**Then move on to contacting about intrest in said plans
**Some smaller yet similar projects to the [[Fleming Island Makerspace]] could be an expansion of the [[Crossroads Lutheren Church Community Garden]] , and looking into using [[Undeveloped Plots as Temporary Community Gardens]]
==Smaller Tasks==
*Contact the two or so youtube channels on collaboration (probably with group decisions on what to say/propose first?)
*Contact that solar panel company on USA sales/distribution
*Make sure the [[Incomplete Pages]] and [[Dead Links]] categories are empty (ie necromance links via the [[Wayback Machine]] , and clean up + interlink pages)
*Check [[Microtasks]] if the above are done


=List=
=List=

Revision as of 21:29, 28 January 2021

Basics

To-Do's

  • Stuff on Business / Advertising Ethics
  • Finish up the remaining "missing parts" in the
  • Start + Finish (mostly, not going to "end it" obiously) the Precision Agriculture and Controlled Enviroment Agriculture categories to finish those mainly in prepreation of a Farmbot (or Universal Axis based adaptation) in a future Community Garden
    • Also include developments on Scihouse Inc on the PBR work, as it can fit in this category (algaculture can get a category of it's own once it grows sufficiently), and is relevant to the bio-petchem stuff being done (here and on scihouse)
  • Tie up all "loose ends", interlink Orphan Pages , complete Incomplete Pages , and just clean up all that as much as possible
    • Also need to discuss/work with the code-skilled people in the discord (and anyone else intrested!) on if the wiki can be fixed/updated, or even a "ai-editor" that is a user account to make this at least semi-automated, and thus less labor intensive saving dev hours for other projects
    • This also makes the wiki less "labrynth-ey" / like the Library of Babel , and moreso something that people can "dive into" without needing a "sherpa" of sorts
  • Interconnect Scihouse Inc , Precious Plastic , and Open Source Low Tech with the wiki more
    • Granted i/we? don't want to make this into some frankenstinian mess, so caution + group planning needed, but there is a huge ammount of Redundancy Waste via lack of a common "information bank" and thus a huge ammount of wasted dev efforts in making 5+ Filament Maker designs, 3+ Shredder Designs, etc (my estimation by the way, data + connecting in the works)
  • Finish out all the "figuring out the big pucture stuff" like all the Scale related, huge named pages, and all that zoomed out "meta" stuff
  • Once that mess is done
    • Time estimate (that as with nearly all of these will be off somehow (too far/not far enough ahead, but i digress) is ~1-2 weeks? (assuming no major unplanned events like a covid outbreak, sudden trip somewhere etc on my side)
  • THEN move on to:
    • Create/Develop more "Concrete Plans" on the Fleming Island Makerspace , mainly:
      • Exact list of "needed things" + BOM for that "low impact, early phase" (about 1/2 done now already?)
      • More powerpoints + spreadsheets on planned budgets/business models for making it presentable, not just "MAKERSPACE HYPE AND IDEAS" , but "Here is my proposal for an expansion of program "x" in a similar manner to the 20XX expansion of location "y's" program. The preliminary analysis shows an estimated budget..." all in nice folders and a presentation + email drafts / templates
      • Drawings of Internal Layouts/Organization (what drawers where for the EARLY stuff, but just to keep it orderly, pegboards and all that), Drawings/GIS overlays of where Community Gardens could go, where VAWTs could go (can be used as Kinetic Art and an "attention grabber" as well as a renewable power source, for example), where a LONG TERM building expansion/shed even could go etc
        • Then even more long term make OBI plans + models to show off for "phase two implementation proposals" etc
  • AFTER/BEFORE/AT THE SAME TIME AS ALL THIS

Smaller Tasks

  • Contact the two or so youtube channels on collaboration (probably with group decisions on what to say/propose first?)
  • Contact that solar panel company on USA sales/distribution
  • Make sure the Incomplete Pages and Dead Links categories are empty (ie necromance links via the Wayback Machine , and clean up + interlink pages)
  • Check Microtasks if the above are done


List

Near Term

Long Term

Internal Links

External Links