To-Do List for User: Eric: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Deleted some stuff, fix it based off of edit history if need be)
(Minor Text Formating Fix)
Line 3: Line 3:
*Finish out all the "figuring out the big pucture stuff" like all the [[Scale]] related, huge named pages, and all that zoomed out "meta" stuff
*Finish out all the "figuring out the big pucture stuff" like all the [[Scale]] related, huge named pages, and all that zoomed out "meta" stuff


==Smaller Tasks==
=Smaller Tasks=
*Contact the two or so youtube channels on collaboration (probably with group decisions on what to say/propose first?)
*Contact the two or so youtube channels on collaboration (probably with group decisions on what to say/propose first?)
*Contact that solar panel company on USA sales/distribution
*Contact that solar panel company on USA sales/distribution

Revision as of 21:33, 28 January 2021

Basics

  • This is the Personal To-Do List for User: Eric
  • Finish out all the "figuring out the big pucture stuff" like all the Scale related, huge named pages, and all that zoomed out "meta" stuff

Smaller Tasks

  • Contact the two or so youtube channels on collaboration (probably with group decisions on what to say/propose first?)
  • Contact that solar panel company on USA sales/distribution
  • Make sure the Incomplete Pages and Dead Links categories are empty (ie necromance links via the Wayback Machine , and clean up + interlink pages)
  • Check Microtasks if the above are done

List

Near Term

Wiki Work

Start + Finish (mostly, not going to "end it" obiously) the Precision Agriculture and Controlled Enviroment Agriculture categories to finish those mainly in prepreation of a Farmbot (or Universal Axis based adaptation) in a future Community Garden

    • Also include developments on Scihouse Inc on the PBR work, as it can fit in this category (algaculture can get a category of it's own once it grows sufficiently), and is relevant to the bio-petchem stuff being done (here and on scihouse)
  • Tie up all "loose ends", interlink Orphan Pages , complete Incomplete Pages , and just clean up all that as much as possible
    • Also need to discuss/work with the code-skilled people in the discord (and anyone else intrested!) on if the wiki can be fixed/updated, or even a "ai-editor" that is a user account to make this at least semi-automated, and thus less labor intensive saving dev hours for other projects
    • This also makes the wiki less "labrynth-ey" / like the Library of Babel , and moreso something that people can "dive into" without needing a "sherpa" of sorts
  • Interconnect Scihouse Inc , Precious Plastic , and Open Source Low Tech with the wiki more
    • Granted i/we? don't want to make this into some frankenstinian mess, so caution + group planning needed, but there is a huge ammount of Redundancy Waste via lack of a common "information bank" and thus a huge ammount of wasted dev efforts in making 5+ Filament Maker designs, 3+ Shredder Designs, etc (my estimation by the way, data + connecting in the works)

Long Term

      • Create/Develop more "Concrete Plans" on the Fleming Island Makerspace , mainly:
      • Exact list of "needed things" + BOM for that "low impact, early phase" (about 1/2 done now already?)
      • More powerpoints + spreadsheets on planned budgets/business models for making it presentable, not just "MAKERSPACE HYPE AND IDEAS" , but "Here is my proposal for an expansion of program "x" in a similar manner to the 20XX expansion of location "y's" program. The preliminary analysis shows an estimated budget..." all in nice folders and a presentation + email drafts / templates
      • Drawings of Internal Layouts/Organization (what drawers where for the EARLY stuff, but just to keep it orderly, pegboards and all that), Drawings/GIS overlays of where Community Gardens could go, where VAWTs could go (can be used as Kinetic Art and an "attention grabber" as well as a renewable power source, for example), where a LONG TERM building expansion/shed even could go etc
        • Then even more long term make OBI plans + models to show off for "phase two implementation proposals" etc
  • AFTER/BEFORE/AT THE SAME TIME AS ALL THIS

Internal Links

External Links