Line 34: Line 34:


'''[[Build Wheel Shaft Attachments]]'''
'''[[Build Wheel Shaft Attachments]]'''
'''[[Build Wheel Shafts]]'''


'''[[Mount Motors]]'''
'''[[Mount Motors]]'''
Line 48: Line 50:


'''[[Mount Cylinders]]'''
'''[[Mount Cylinders]]'''
'''[[Build Wheel Shafts]]'''


=Hydraulic Motor Interface Plates=
=Hydraulic Motor Interface Plates=

Revision as of 03:19, 19 June 2011

Strategy:

  • List steps in order of duty – Power Cube to Tractor to CEB press
  • Assess capacity required and allocate tasks to 6 fabricators and local shop
  • List risks and recovery plans
  • Assess daily, before and after workday
  • Draw up personnel plan, detailed

Power Cube Tasks

See Power Cube Documentation


Build Hydraulic Tank

Build Fuel Tank

Prepare Electrical System Components

Build Mufflers

Assemble Power Cube

Mount Power Cube

Test Power Cube on Tractor

Tractor Tasks

See Tractor Documentation

Build Frame

Build Wheel Shaft Attachments

Build Wheel Shafts

Mount Motors

Mount Wheels

Assemble H-arms

Mount Loader Arms

Build QA Plate Mounting Eyes

Build QA Plate

Mount Cylinders

Hydraulic Motor Interface Plates

  • Prepare plates, 4 per tractor - 6x8x1/2"
  • Download CAM files for interface plates - []
  • Torch out plates (or cut by hand)


Hydraulic Motor Mount Plates

  • Prepare plates, 4 per tractor, 8x10x1/2"
  • Download CAM files -[]
  • Torch out plates (or cut by hand)


May Production Run New Generator Tasks

May Production Run Generator Tasks

May Production Run CEB Tasks

May Production Run CEB Tasks