(Created page with "CEB instructionals to be transfered to Make Projects Unless otherwise noted, all steps are independent and can be done in any order. ===Simple plates=== Good to start with, ...") |
(No difference)
|
Revision as of 06:26, 14 December 2011
CEB instructionals to be transfered to Make Projects
Unless otherwise noted, all steps are independent and can be done in any order.
Simple plates
Good to start with, all you need to do is punch/drill holes.
Structural Supports
- Leg Holders
- Legs
- Feet
- Needs 4 Leg Holders
- Arms - primary-
- Arms - secondary
- Needs 8 Leg Holders
- Grate mounts-
- Hopper supports-
- Needs Soil Shaker (this should be dis-assembled, although you can do it assembled, its just heavier and more difficult to maneuver.)
Soil Loading System
- Hopper sheet metal-
- Hopper mounting plate
- Soil grate-
- Soil Shaker motor unit-
- Soil Shaker - needs fab drawings
Machine Core
Frame Preparation
Assembling the frame
You'll need to have finished all other components in Machine Core and Frame Preparation and 2 Leg Holders