May Production Plan: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
(28 intermediate revisions by the same user not shown)
Line 11: Line 11:
See [[Power Cube Documentation]]
See [[Power Cube Documentation]]


'''[[Mount Power Cube]]'''


'''[[Test Power Cube on Tractor]]'''


'''[[Build Hydraulic Tanks]]'''
'''[[Build Hydraulic Tank]]'''


'''[[Build Fuel Tank]]'''
'''[[Build Fuel Tank]]'''


'''[[Mount Engine and Pump]]'''
'''[[Prepare Electrical System Components]]'''


'''Prepare Electrical System Components'''
'''[[Build Mufflers]]'''


*[4] Cut lugs
'''[[Assemble Power Cube]]
*[4] Drill lugs
*Prepare battery to solenoid cable
*Prepare solenoid to starter cable
*Select solenoid location, drill frame, and attach solenoid to frame
*Prepare charging wire, attach charging wire extension to engine
*Purchase starter switches from Maysville
*Search for wire at FeF
*Wire up starter switches - kill wire, solenoid wire, power wire
*Select location for starter switch
*Install starter switch
*Prepare and weld on mount for throttle cable
*Attach throttle cable
*Build battery box
*Secure battery to battery box
* Bolt on terminals


'''Weld Mufflers – do 8 more'''
'''[[Mount Power Cube]]'''


*Secure  8 close nips, 1”
'''[[Test Power Cube on Tractor]]'''
*Secure 8 elbows, 1”
*Cut 2 rings – flange and end piece of large tube
*Grind and ream rings
*Prepare 1 washer – 1/2” - for closing inner tube
*Prepare 1 closure of washer
*Mark pattern for muffler flange
*Torch muffler flange, use #1 torch head
*Procure gasket material for mufflers


=Tractor Tasks=
=Tractor Tasks=
Line 56: Line 31:
See [[Tractor Documentation]]
See [[Tractor Documentation]]


See [[May Production Run Tractor Tasks]]
'''[[Build Frame]]'''
 
'''[[Build QA Plate]]'''
 
'''[[Build Wheel Shaft Attachments]]'''
 
'''[[Build Wheel Shafts]]'''
 
'''[[Mount Motors]]'''
 
'''[[Mount Wheels]]''' - fabricate wheel mounting plates
 
'''[[Assemble H-arms]]'''
 
'''[[Mount QA Plates]]'''
 
'''[[Mount Cylinders]]'''
 
Then final assembly:
 
'''[[Insert Wheel Shaft Assemblies into Bearings]]'''
 
'''[[Build Wheel Motor Assemblies and Mount on Tractor]]'''
 
=Hydraulic Motor Interface Plates=
*Prepare plates, 4 per tractor - 6x8x1/2"
*Download CAM files for interface plates - []
*Torch out plates (or cut by hand)
 
 
=Hydraulic Motor Mount Plates=
*Prepare plates, 4 per tractor, 8x10x1/2"
*Download CAM files -[]
*Torch out plates (or cut by hand)
 


=May Production Run New Generator Tasks=
=May Production Run New Generator Tasks=

Latest revision as of 21:23, 23 June 2011

Strategy:

  • List steps in order of duty – Power Cube to Tractor to CEB press
  • Assess capacity required and allocate tasks to 6 fabricators and local shop
  • List risks and recovery plans
  • Assess daily, before and after workday
  • Draw up personnel plan, detailed

Power Cube Tasks

See Power Cube Documentation


Build Hydraulic Tank

Build Fuel Tank

Prepare Electrical System Components

Build Mufflers

Assemble Power Cube

Mount Power Cube

Test Power Cube on Tractor

Tractor Tasks

See Tractor Documentation

Build Frame

Build QA Plate

Build Wheel Shaft Attachments

Build Wheel Shafts

Mount Motors

Mount Wheels - fabricate wheel mounting plates

Assemble H-arms

Mount QA Plates

Mount Cylinders

Then final assembly:

Insert Wheel Shaft Assemblies into Bearings

Build Wheel Motor Assemblies and Mount on Tractor

Hydraulic Motor Interface Plates

  • Prepare plates, 4 per tractor - 6x8x1/2"
  • Download CAM files for interface plates - []
  • Torch out plates (or cut by hand)


Hydraulic Motor Mount Plates

  • Prepare plates, 4 per tractor, 8x10x1/2"
  • Download CAM files -[]
  • Torch out plates (or cut by hand)


May Production Run New Generator Tasks

May Production Run Generator Tasks

May Production Run CEB Tasks

May Production Run CEB Tasks