(→Steel) |
|||
Line 39: | Line 39: | ||
==Fabrication Instructions:== | ==Fabrication Instructions:== | ||
===Step 1: Punch the holes in the horizontal members ( | ===Pre Assembly=== | ||
===Assembly=== | |||
====Step 1: Punch the holes in the horizontal members (B) and in the drawer members (C)=== | |||
[[Image:punchedholes.jpg|thumb|Step 1]] | [[Image:punchedholes.jpg|thumb|Step 1]] | ||
*In the horizontal members, the holes should be 7/8” in from the long side, and as close as you can get them to the wall of the U-channel. There are 4 holes in each piece. | *In the horizontal members, the holes should be 7/8” in from the long side, and as close as you can get them to the wall of the U-channel. There are 4 holes in each piece. | ||
* In the drawer members, the holes should be 4 7/8” in from the long side, and as close as you can get them to the wall of the U-Channel. There are 4 holes in each piece. | * In the drawer members, the holes should be 4 7/8” in from the long side, and as close as you can get them to the wall of the U-Channel. There are 4 holes in each piece. | ||
===Step 2: Mag Drill Holes in Verticals.=== | ====Step 2: Mag Drill Holes in Verticals.==== | ||
#Gather materials for the “Jig”; this means 6”x12” tubing (52”) and any extra heavy U Channel. If you don't have any laying around, you can use one drawer member, and one spacer on each side. | #Gather materials for the “Jig”; this means 6”x12” tubing (52”) and any extra heavy U Channel. If you don't have any laying around, you can use one drawer member, and one spacer on each side. | ||
#Clamp the vertical pieces to the "Jig" on each end, with extra U channel in between the tubing and the vertical pieces. See the diagram on the right: [[Image:Vertical_Beams.jpgthumb|right|200px|C-Clamp the vertical pieces to the jig as shown.]] | |||
#Clamp one horizontal member at each end of the jig. | |||
*Ensure they are square with the jig by using a large square | |||
*Clamp using 1 or 2 vise grips on either side. | |||
#Transfer Punch thru the holes on B. | |||
{{Hint:It really helps to label each piece before taking it apart, so that if you end up unbolting the piece later, you'll know exactly where it goes and in what orientation.}} | |||
#Mark where the edge of the horizontal member is in relation to the vertical members on the vertical member. Use a square to mark the same location on the opposite side. Do this on all four locations. | |||
#Remove the horizontal members. | |||
#Use a Mag-Drill to drill 3/4" holes in each spot you transfer punched. | |||
#Flip the jig over so you have access to drill the other holes. | |||
#Align the other horizontal members with the marks you previously made, and insure once more that they are square. | |||
*If it is on the mark on each side, but not square, just get it as close as you can to the marks while insuring it is square. | |||
#Clamp the members in place. | |||
#Transfer punch them. | |||
#Remove them. | |||
#Mag Drill them. | |||
#Unclamp the verticals from the jig. | |||
Line 57: | Line 78: | ||
[[Image:Framestanding.jpg|thumb| Step 3]] | [[Image:Framestanding.jpg|thumb| Step 3]] | ||
== Diagrams == | == Diagrams == | ||
Revision as of 01:01, 25 August 2011
|
Tools Required
- Torch
- Hole Punch
- Mag Drill
- 1/2” Allen Wrench
Materials Required
Steel
- 6” Heavy (7/16”) U-Channel- 274 1/2”
- A- 54” (2); Vertical Members
- B- 20 3/4” (4); Horizontal Members
- C- 28 3/4” (2); Drawer Members
- D- 13” (2); Spacers
- 6" Light (1/4") U-Channel-41.5"; Cylinder support: 20 3/4" (2)
- 2"x2"x1/4" Angle: 12"; Dirt Blockers: 6” (2)
- 1 1/2” DOM Roundstock: 12”; Cylinder Pin: 8 1/2”, Press Foot Filler: 3 1/2”
- 1 1/2” Inter Diameter DOM Tubing: 2 1/2"; Pin Receptors:1 1/4” (2)
- 1”x4” Plate: Lower Press Foot: 10” (1)
- 1”x6” Plate: Upper Press Foot: 12” (1)
- 2” U-Channel: 1.5” (2); Cylinder Spacers
- 1” Pipe: 1.5” (2); Cylinder Spacers
- 1/4”x1” Flatbar: 13” (1); Magnet holder
- 3/8” Rebar: 3.5” (2); Sensor Holder
- For Optional “Jig”: 6”x12” Tubing: 52”
Nuts and Bolts
- 3/4”x1.5” Bolts (28)
- 3/4” x 2.5” Bolts (6)
- 3/4” Steel Nuts (9)
- 3/4” Galvanized Nuts (40)
- 3/4” Threaded Rod: 16”
Hydraulics
- 5”x12” 3000 PSI Hydraulic cylinder Buy (1)
- 3/4” to 3/4” Hydraulic Coupler (2)
- 3/4” Female Quick Coupler (1)
- 3/4” Male Quick Coupler (1)
Fabrication Instructions:
Pre Assembly
Assembly
=Step 1: Punch the holes in the horizontal members (B) and in the drawer members (C)
- In the horizontal members, the holes should be 7/8” in from the long side, and as close as you can get them to the wall of the U-channel. There are 4 holes in each piece.
- In the drawer members, the holes should be 4 7/8” in from the long side, and as close as you can get them to the wall of the U-Channel. There are 4 holes in each piece.
Step 2: Mag Drill Holes in Verticals.
- Gather materials for the “Jig”; this means 6”x12” tubing (52”) and any extra heavy U Channel. If you don't have any laying around, you can use one drawer member, and one spacer on each side.
- Clamp the vertical pieces to the "Jig" on each end, with extra U channel in between the tubing and the vertical pieces. See the diagram on the right:
- Clamp one horizontal member at each end of the jig.
- Ensure they are square with the jig by using a large square
- Clamp using 1 or 2 vise grips on either side.
- Transfer Punch thru the holes on B.
- Mark where the edge of the horizontal member is in relation to the vertical members on the vertical member. Use a square to mark the same location on the opposite side. Do this on all four locations.
- Remove the horizontal members.
- Use a Mag-Drill to drill 3/4" holes in each spot you transfer punched.
- Flip the jig over so you have access to drill the other holes.
- Align the other horizontal members with the marks you previously made, and insure once more that they are square.
- If it is on the mark on each side, but not square, just get it as close as you can to the marks while insuring it is square.
- Clamp the members in place.
- Transfer punch them.
- Remove them.
- Mag Drill them.
- Unclamp the verticals from the jig.
To be continued, during the month of August, 2011...
Diagrams
Step 1: Gather the Form Pieces
Step 2: Put the Form Pieces Together
Step 3: Line the Vertical Beams along the Form and C-Clamp them in Place
Step 4: Place One Each of the Upper and Lower Cross Beams
Step 5: Flip the Frame
Step 6: Place the Remaining Cross Beams
This diagram shows the pieces needed for the frame. Click to enlarge:
Video Explantion