CEB Press/Manufacturing Instructions/Brick Holder Plate: Difference between revisions
Jump to navigation
Jump to search
(created) |
No edit summary |
||
Line 1: | Line 1: | ||
{{Template:CEB Press Manufacturing Instructions Navbox}} | |||
The brickholder plate attaches to the primary arms and is where the bricks go when the machine spits them out. You could also replace the plate with some rollers. | |||
=Tools Required= | =Tools Required= | ||
*Hole Punch with 1" dies | *Hole Punch with 1" dies | ||
Line 11: | Line 13: | ||
=Fabrication steps= | =Fabrication steps= | ||
Punch the 1" holes in the proper locations. They are 1 1/4" away from 17" side, and 2" away from 29" side. | Punch the 1" holes in the proper locations. They are 1 1/4" away from 17" side, and 2" away from 29" side. | ||
[[Category:CEB]] |
Revision as of 05:37, 22 September 2011
|
The brickholder plate attaches to the primary arms and is where the bricks go when the machine spits them out. You could also replace the plate with some rollers.
Tools Required
- Hole Punch with 1" dies
Materials
- 1/4" Plate: 17"x29"
Diagrams
Wanted: Better diagram
Fabrication steps
Punch the 1" holes in the proper locations. They are 1 1/4" away from 17" side, and 2" away from 29" side.