CEB Press/Manufacturing Instructions/Controller Mount: Difference between revisions
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
*1/4" x 2" flatbar: 12" | *1/4" x 2" flatbar: 12" | ||
=Diagrams= | =Diagrams= | ||
[[Image:controllerplate.png|600px]] | |||
=Fabrication instructions= | =Fabrication instructions= | ||
#Find your controller box and locate its mounting holes on the back. Use spray paint to spray a nice wet coating over the hole locations, then press your 6x15 plat to it, square and so that the top hole is about a 1/2" away from the top, to mark the hole locations. | #Find your controller box and locate its mounting holes on the back. Use spray paint to spray a nice wet coating over the hole locations, then press your 6x15 plat to it, square and so that the top hole is about a 1/2" away from the top, to mark the hole locations. |
Revision as of 00:52, 5 October 2011
Main > Housing and construction > CEB Press > CEB press building instructions
|
The controller mount attaches the controller box to the primary arms.
Tools Required
- Hole punch with 13/16" die.
- Drill press with 1/4" or larger bit.
- Welder
Materials Required
- 1/4" x 6" flatbar: 15"
- 1/4" x 2" flatbar: 12"
Diagrams
Fabrication instructions
- Find your controller box and locate its mounting holes on the back. Use spray paint to spray a nice wet coating over the hole locations, then press your 6x15 plat to it, square and so that the top hole is about a 1/2" away from the top, to mark the hole locations.
- Drill the small holes (you might want to oversize them a bit above 1/4", as it very difficult to get them in the perfect location.)
- Punch 13/16 holes 1" in and 1" up at the bottom of the plate.
- Weld the 2" flatbar perpendicular to the plate on the back. The bottom should be flush with it, so the top hole for the controller is still accessible.