CEB Press/Manufacturing Instructions/Leg Holders: Difference between revisions
Jump to navigation
Jump to search
Line 18: | Line 18: | ||
It's suggested you prepare all leg holders at once, doing each step for all leg holders before moving on. | It's suggested you prepare all leg holders at once, doing each step for all leg holders before moving on. | ||
#Torch a 3/4” hole in the center of one of the faces of the tubing; make sure it's large enough for a 3/4” bolt. | #Torch a 3/4” hole in the center of one of the faces of the tubing; make sure it's large enough for a 3/4” bolt. | ||
#*It's not crucial that the hole be centered. | #*It's not crucial that the hole be centered. It just needs to be somewhere close to the center. | ||
#Weld the nut over the hole, ensuring the nut is level, and the hole is clear. Make sure no spatter goes into the threads by covering the top of the nut. | #Weld the nut over the hole, ensuring the nut is level, and the hole is clear. Make sure no spatter goes into the threads by covering the top of the nut. | ||
#Thread the bolt into the nut. | #Thread the bolt into the nut. |
Revision as of 22:37, 12 December 2011
|
You will need 14 of these per machine. They are required for Arms - secondary (8), Feet(4), Frame with main cylinder (2)
Tools Required:
- Torch
- Welder
- Grinder
Materials Required
- 2 1/2” x 2 1/2" x 3/16" thick square steel tubing – 6” long (14)
- 3/4” nut (14)
- 3/4” x 1.5” bolt (14)
Fabrication Instructions
It's suggested you prepare all leg holders at once, doing each step for all leg holders before moving on.
- Torch a 3/4” hole in the center of one of the faces of the tubing; make sure it's large enough for a 3/4” bolt.
- It's not crucial that the hole be centered. It just needs to be somewhere close to the center.
- Weld the nut over the hole, ensuring the nut is level, and the hole is clear. Make sure no spatter goes into the threads by covering the top of the nut.
- Thread the bolt into the nut.