CEB Press/Manufacturing Instructions/Arms - primary: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 36: Line 36:
== Fabrication Steps ==
== Fabrication Steps ==
Mark and punch all holes.
Mark and punch all holes.
*Label which arm is the left and which is the right.

Revision as of 06:01, 14 December 2011

Farmewitharms.jpg

The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the Brickholder plate, the Dirt-keeper plate, the Controller Mount, and the Valve Mount.

Tools Required

Hole punch with 13/16" and 3/4" dies

Materials Required

  • 2 pieces 72" long - 4"x6"x1/2" angle steel

Diagrams

Left

Right


Fabrication Steps

Mark and punch all holes.

  • Label which arm is the left and which is the right.