(Created page with "Strategy: *List steps in order of duty – Power Cube to Tractor to CEB press *Assess capacity required *Allocate tasks to 6 fabricators and local shop *List risks and recovery ...")
 
 
(81 intermediate revisions by the same user not shown)
Line 2: Line 2:


*List steps in order of duty – Power Cube to Tractor to CEB press
*List steps in order of duty – Power Cube to Tractor to CEB press
*Assess capacity required
*Assess capacity required and allocate tasks to 6 fabricators and local shop
*Allocate tasks to 6 fabricators and local shop
*List risks and recovery plans
*List risks and recovery plans
*Assess daily, before and after workday
*Assess daily, before and after workday
*Draw up personnel plan, detailed


=Power Cube Tasks=
=Power Cube Tasks=


Shake Down Motor Size
See [[Power Cube Documentation]]


*Measure Power Cube and location of mount
*[2] Cut Mount – 1/4x4 by appropriate measurement
*[2] Drill Mounts – 2 holes on ends each
*Transfer punch mount hole locations
*Mag drill holes in frame
*
*Prepare Power Cube Mount
*Mount Power Cube on Tractor
Build Hydraulic tank


*Grind tanks down to clean
 
*Clean edges and bungs
'''[[Build Hydraulic Tank]]'''
*Ream any necessary holes
 
*Lay out 3 sets on welding table
'''[[Build Fuel Tank]]'''
*Close off bungs with fittings
 
*Tack everything
'''[[Prepare Electrical System Components]]'''
*Weld
 
*Assemble
'''[[Build Mufflers]]'''
 
'''[[Assemble Power Cube]]
 
'''[[Mount Power Cube]]'''
 
'''[[Test Power Cube on Tractor]]'''
 
=Tractor Tasks=
 
See [[Tractor Documentation]]
 
'''[[Build Frame]]'''
 
'''[[Build QA Plate]]'''
 
'''[[Build Wheel Shaft Attachments]]'''
 
'''[[Build Wheel Shafts]]'''
 
'''[[Mount Motors]]'''
 
'''[[Mount Wheels]]''' - fabricate wheel mounting plates
 
'''[[Assemble H-arms]]'''
 
'''[[Mount QA Plates]]'''
 
'''[[Mount Cylinders]]'''
 
Then final assembly:
 
'''[[Insert Wheel Shaft Assemblies into Bearings]]'''
 
'''[[Build Wheel Motor Assemblies and Mount on Tractor]]'''
 
=Hydraulic Motor Interface Plates=
*Prepare plates, 4 per tractor - 6x8x1/2"
*Download CAM files for interface plates - []
*Torch out plates (or cut by hand)
 
 
=Hydraulic Motor Mount Plates=
*Prepare plates, 4 per tractor, 8x10x1/2"
*Download CAM files -[]
*Torch out plates (or cut by hand)
 
 
=May Production Run New Generator Tasks=
 
[[May Production Run Generator Tasks]]
 
=May Production Run CEB Tasks=
 
[[May Production Run CEB Tasks]]
 
[[Category:Fabrication Procedures]]

Latest revision as of 21:23, 23 June 2011

Strategy:

  • List steps in order of duty – Power Cube to Tractor to CEB press
  • Assess capacity required and allocate tasks to 6 fabricators and local shop
  • List risks and recovery plans
  • Assess daily, before and after workday
  • Draw up personnel plan, detailed

Power Cube Tasks

See Power Cube Documentation


Build Hydraulic Tank

Build Fuel Tank

Prepare Electrical System Components

Build Mufflers

Assemble Power Cube

Mount Power Cube

Test Power Cube on Tractor

Tractor Tasks

See Tractor Documentation

Build Frame

Build QA Plate

Build Wheel Shaft Attachments

Build Wheel Shafts

Mount Motors

Mount Wheels - fabricate wheel mounting plates

Assemble H-arms

Mount QA Plates

Mount Cylinders

Then final assembly:

Insert Wheel Shaft Assemblies into Bearings

Build Wheel Motor Assemblies and Mount on Tractor

Hydraulic Motor Interface Plates

  • Prepare plates, 4 per tractor - 6x8x1/2"
  • Download CAM files for interface plates - []
  • Torch out plates (or cut by hand)


Hydraulic Motor Mount Plates

  • Prepare plates, 4 per tractor, 8x10x1/2"
  • Download CAM files -[]
  • Torch out plates (or cut by hand)


May Production Run New Generator Tasks

May Production Run Generator Tasks

May Production Run CEB Tasks