Line 2: Line 2:


*List steps in order of duty – Power Cube to Tractor to CEB press
*List steps in order of duty – Power Cube to Tractor to CEB press
*Assess capacity required
*Assess capacity required and allocate tasks to 6 fabricators and local shop
*Allocate tasks to 6 fabricators and local shop
*List risks and recovery plans
*List risks and recovery plans
*Assess daily, before and after workday
*Assess daily, before and after workday
*Draw up personnel plan, detailed


=Power Cube Tasks=
=Power Cube Tasks=


'''Shake Down Motor Size'''
See [[Power Cube Documentation]]


*Start with Power Cube mounting. Measure Power Cube and location of mount
*[2] Cut Mount – 1/4x4 by appropriate measurement
*[2] Drill Mounts – 2 holes on ends each
*Transfer punch mount hole locations for top and bottom mount
*Mark mount hole locations on other side of beams
*Weld Mount eye on bottom of Power Cube
*Weld mount eye on bottom Power Cube Mount
*Mag drill holes in frame -
*Mount Power Cube on Tractor


'''Test Power Cube'''


*Move PC with tractor I
'''[[Build Hydraulic Tank]]'''
*Mount Power Cube on Tractor
*Connect Hoses


'''Order Outstanding Components'''  
'''[[Build Fuel Tank]]'''
*Order Power Beyond Fittings (4 sets) - [https://www.surpluscenter.com/item.asp?catname=&item=9-4895-B]
*Order 2 more CEB main cylinders


'''Build Hydraulic tanks'''
'''[[Prepare Electrical System Components]]'''


*Work on 3 at a time
'''[[Build Mufflers]]'''
*Grind tanks down to clean
*Clean edges and bungs
*Ream any necessary holes
*Lay out 3 sets on welding table
*Close off bungs with fittings
*Tack everything
*Weld
*Assemble


'''Prepare Engine and Pump Mounting'''
'''[[Assemble Power Cube]]


*Assess fittings for hydraulic pump
'''[[Mount Power Cube]]'''
*Put fittings on hydraulic pump
*Cut plate for Engine Mount
*Cut plate for hydraulic pump
*[1] Cut angle for Power Cube Mount


'''[[Test Power Cube on Tractor]]'''


'''Prepare Hydraulic system components'''
=Tractor Tasks=


*Mount suction strainer in tank
See [[Tractor Documentation]]
*Mount suction strainer fittings up to 3/4" hose barb
*Cut hose to size
*Mount breather cap
*Assemble return line filter assembly


'''Prepare Electrical System Components'''
'''[[Build Frame]]'''


*[4] Cut lugs
'''[[Build QA Plate]]'''
*[4] Drill lugs
*Prepare battery to solenoid wire
*Prepare solenoid to starter wire
*Prepare
*Drill frame and attach solenoid to frame
*Prepare wires:  kill switch wire, charging wire, wire to switch, wire to solenoid
*


'''Weld Mufflers – do 8 more'''
'''[[Build Wheel Shaft Attachments]]'''
 
'''[[Build Wheel Shafts]]'''
 
'''[[Mount Motors]]'''
 
'''[[Mount Wheels]]''' - fabricate wheel mounting plates
 
'''[[Assemble H-arms]]'''
 
'''[[Mount QA Plates]]'''
 
'''[[Mount Cylinders]]'''
 
Then final assembly:
 
'''[[Insert Wheel Shaft Assemblies into Bearings]]'''
 
'''[[Build Wheel Motor Assemblies and Mount on Tractor]]'''
 
=Hydraulic Motor Interface Plates=
*Prepare plates, 4 per tractor - 6x8x1/2"
*Download CAM files for interface plates - []
*Torch out plates (or cut by hand)
 
 
=Hydraulic Motor Mount Plates=
*Prepare plates, 4 per tractor, 8x10x1/2"
*Download CAM files -[]
*Torch out plates (or cut by hand)


*Secure  8 close nips, 1”
*Secure 8 elbows, 1”
*Cut 2 rings – flange and end piece of large tube
*Grind and ream rings
*Prepare 1 washer – 1/2” - for closing inner tube
*Prepare 1 closure of washer
*Mark pattern for muffler flange
*Torch muffler flange, use #1 torch head
*Procure gasket material for mufflers


=May Production Run New Generator Tasks=
=May Production Run New Generator Tasks=

Latest revision as of 21:23, 23 June 2011

Strategy:

  • List steps in order of duty – Power Cube to Tractor to CEB press
  • Assess capacity required and allocate tasks to 6 fabricators and local shop
  • List risks and recovery plans
  • Assess daily, before and after workday
  • Draw up personnel plan, detailed

Power Cube Tasks

See Power Cube Documentation


Build Hydraulic Tank

Build Fuel Tank

Prepare Electrical System Components

Build Mufflers

Assemble Power Cube

Mount Power Cube

Test Power Cube on Tractor

Tractor Tasks

See Tractor Documentation

Build Frame

Build QA Plate

Build Wheel Shaft Attachments

Build Wheel Shafts

Mount Motors

Mount Wheels - fabricate wheel mounting plates

Assemble H-arms

Mount QA Plates

Mount Cylinders

Then final assembly:

Insert Wheel Shaft Assemblies into Bearings

Build Wheel Motor Assemblies and Mount on Tractor

Hydraulic Motor Interface Plates

  • Prepare plates, 4 per tractor - 6x8x1/2"
  • Download CAM files for interface plates - []
  • Torch out plates (or cut by hand)


Hydraulic Motor Mount Plates

  • Prepare plates, 4 per tractor, 8x10x1/2"
  • Download CAM files -[]
  • Torch out plates (or cut by hand)


May Production Run New Generator Tasks

May Production Run Generator Tasks

May Production Run CEB Tasks

May Production Run CEB Tasks