| See [[Tractor Documentation]] | See [[Tractor Documentation]] | ||
| [[ | '''[[Build Frame]]''' | ||
| [[ | '''[[Build QA Plate]]''' | ||
| '''[[Build Wheel Shaft Attachments]]''' | |||
| '''[[Build Wheel Shafts]]''' | |||
| '''[[Mount Motors]]''' | |||
| '''[[Mount Wheels]]''' - fabricate wheel mounting plates | |||
| '''[[Assemble H-arms]]''' | |||
| '''[[Mount QA Plates]]''' | |||
| '''[[Mount Cylinders]]''' | |||
| Then final assembly: | |||
| '''[[Insert Wheel Shaft Assemblies into Bearings]]''' | |||
| '''[[Build Wheel Motor Assemblies and Mount on Tractor]]''' | |||
| =Hydraulic Motor Interface Plates= | =Hydraulic Motor Interface Plates= | ||
| Line 98: | Line 66: | ||
| *Torch out plates (or cut by hand) | *Torch out plates (or cut by hand) | ||
| =May Production Run New Generator Tasks= | =May Production Run New Generator Tasks= | ||
Latest revision as of 21:23, 23 June 2011
Strategy:
- List steps in order of duty – Power Cube to Tractor to CEB press
- Assess capacity required and allocate tasks to 6 fabricators and local shop
- List risks and recovery plans
- Assess daily, before and after workday
- Draw up personnel plan, detailed
Power Cube Tasks
Prepare Electrical System Components
Tractor Tasks
Mount Wheels - fabricate wheel mounting plates
Then final assembly:
Insert Wheel Shaft Assemblies into Bearings
Build Wheel Motor Assemblies and Mount on Tractor
Hydraulic Motor Interface Plates
- Prepare plates, 4 per tractor - 6x8x1/2"
- Download CAM files for interface plates - []
- Torch out plates (or cut by hand)
Hydraulic Motor Mount Plates
- Prepare plates, 4 per tractor, 8x10x1/2"
- Download CAM files -[]
- Torch out plates (or cut by hand)
May Production Run New Generator Tasks
May Production Run Generator Tasks