#Place one of the DOM tubing pieces in the center of each of the sprayed marks and spray paint around this to mark where you will torch.
#Place one of the DOM tubing pieces in the center of each of the sprayed marks and spray paint around this to mark where you will torch.
#Torch around the outside of the ring left by the DOM tubing.
#Torch around the outside of the ring left by the DOM tubing.
#Insure the tubing will go thru each hole. If not, retorch it.
#Insure the tubing will go thru each hole. If not, retorch it. Grind off the slag.
 
#Lay the cylinder back down and replace the top crossmember. Place the tubing in the torched holes.
 
#Insure the pin will go thru the tubing and the cylinder. If not, retorch the holes so that it will.
 
#With the pin held in, weld the tubing on the top in place (Youll want to tack it in many places before welding around it.). Then tack it as best you can on the back by hanging the frame off of the table and overhead welding.
#Remove cylinder and pin, as well as the two crossmembers.
#Fully weld the tubing on both sides. Jump around a lot to minimize any warping on the tube. Block the insides of the tubing so no spatter goes inside.
#Replace the crossmembers and the cylinder. Insure the pin still fits and hammer it thru.


===To be continued, during the month of August, 2011...===
===To be continued, during the month of August, 2011...===

Revision as of 15:58, 28 August 2011

Tools Required

  • Torch
  • Hole Punch
  • Mag Drill
  • 1/2” Allen Wrench

Materials Required

Steel

  • 6” Heavy (7/16”) U-Channel- 274 1/2”
    • A- 54” (2); Vertical Members
    • B- 20 3/4” (4); Horizontal Members
    • C- 28 3/4” (2); Drawer Members
    • D- 13” (2); Spacers
  • 6" Light (1/4") U-Channel-41.5"; Cylinder support: 20 3/4" (2)
  • 2"x2"x1/4" Angle: 12"; Dirt Blockers: 6” (2)
  • 1 1/2” DOM Roundstock: 12”; Cylinder Pin: 8 1/2”, Press Foot Filler: 3 1/2”
  • 1 1/2” Inter Diameter DOM Tubing: 2 1/2"; Pin Receptors:1 1/4” (2)
  • 1”x4” Plate: Lower Press Foot: 10” (1)
  • 1”x6” Plate: Upper Press Foot: 12” (1)
  • 2” U-Channel: 1.5” (2); Cylinder Spacers
  • 1” Pipe: 1.5” (2); Cylinder Spacers
  • 1/4”x1” Flatbar: 13” (1); Magnet holder
  • 3/8” Rebar: 3.5” (2); Sensor Holder
    • For Optional “Jig”: 6”x12” Tubing: 52”

Nuts and Bolts

  • 3/4”x1.5” Bolts (28)
  • 3/4” x 2.5” Bolts (6)
  • 3/4” Steel Nuts (9)
  • 3/4” Galvanized Nuts (40)
  • 3/4” Threaded Rod: 16”

Hydraulics

  • 5”x12” 3000 PSI Hydraulic cylinder Buy (1)
  • 3/4” to 3/4” Hydraulic Coupler (2)
  • 3/4” Female Quick Coupler (1)
  • 3/4” Male Quick Coupler (1)

Fabrication Instructions:

Pre Assembly

The following can be done in any order, prior to assembly.

Punch the holes in the horizontal members (B) and in the drawer members (C)

the punched holes
  • In the horizontal members, the holes should be 7/8” in from the long side, and as close as you can get them to the wall of the U-channel. There are 4 holes in each piece.
  • In the drawer members, the holes should be 4 7/8” in from the long side, and as close as you can get them to the wall of the U-Channel. There are 4 holes in each piece.

Prepare the main cylinder

Prepare the press feet
  1. Mark and magdrill 13/16" holes in 1"x4"x10" plate for the lower press foot. They should be centered shortways, and 1" from the edge to the center of the holes long ways.
  2. Place this centered on the 1"x6"x12" upper press plate and transfer punch and drill those holes again.
  3. Torch out a 4 1/4" x 2 3/4" rectangular hole in the lower press plate. Grind it smooth.
  4. Cut two 2.5" pieces of 3/4" threaded rod.
  5. Plug weld the threaded rod into the upper press plate, so that the threaded rod is about 1/4" deep in the plate. Fill the hole, then grind it flush.
Attach them to the cylinder
  1. Expand the cylinder so the shaft is fully extended.
  • You can do this either by attaching a hydraulic hose between the ports, and pulling it manually (Requires a lot of muscle!) or by attaching it to some sort of hydraulic motor (We use our power cubes) and using a valve to do it.
  • The Prince brand cylinder uses a really large allen wrench for their plugs. If you can't find one, you can make one like we did. media:allentool.jpg
  1. Weld a 3.5" piece of 1.5" DOM roundstock inside of the tubing at the end of the shaft.

Warning.png Warning: Take care that the top of the shaft doesn't get hot; there is a rubber seal between that and the cylinder that will melt and cause leaking if you're not careful. If it starts getting warm, dunk the shaft in water to cool it down.

  1. Stand the cylinder up vertically and support it using some sort of rope so it is as close to square vertically as possible.
    The cylinder standing
    . Place the tubing at the end inside of the hole in the lower press foot.
  2. Insure the cylinder is square to the plate in all directions.


HintLightbulb.png Hint: Since there is a lip on the cylinder, its hard to tell if its square unless you use two squares, one on the lip and against the other one which rests on the table

  1. Tack the lower press foot from all dimensions.
  2. Insure the cylinder is still square with it, if not, remove the tacks and fix it.
  3. Weld the two together on the top. There will need to be at least 2 layers of weld.

Warning.png Warning: Dunk this frequently, even if the shaft is not getting hot! The plate will warp upwards and cause you lots of woe (trust me) if you do not.

  1. Gather some press foot support pieces. We used scrap 1" plate torchings, but anything close to a 1"x1"x2.5" piece will do.
  2. Weld these as close as you can to the tubing and the press plate
    the press foot supports
  3. Lower the hanging cylinder and flip it upside down.
  4. Fill in the bottom side of it with welds. This will require many layers of welds and many dunks to cool it.
  5. Grind it flush with the rest of the plate. A few spots where the welds are below the surface is OK, but the majority of the surface should be level.
  6. Put the upper press foot into the lower one and tighten nuts onto the threaded rod.
  7. Stand the cylinder up again and insure the press plate is still square with the cylinder.
  • If its not, you'll need to add shims between the two press plates until they are square. with the cylinder

Prepare the wide cylinder supports

  1. Punch 3/4" holes in the thin U-Channel in the same manner as with the horizontal members.
  2. Weld the 2"x2" angle (5.5") centered and squared on one side of the U-Channel.
  3. Torch a hole 3/4" away from the end of the 2"x2" for a 3/4" bolt and grind it clean.
  4. Place a steel nut over the hole and ensure it is clear for a bolt and flush.
  5. Weld the nut in place.

Prepare the thin cylinder supports

  • Weld some 3/4" ID pipe (3/4" to 1") to the 3" U-channel. 4-8 good tacks is sufficient.
  • Make some 6" long 3/4" bolts. See Making Bolts

Prepare the magnet holder

  1. Shield the threaded rod from spatter by putting 2 nuts on it.
  2. Prop up the 1/2"x1" flatbar so it's level with the center of the threaded rod, ensuring they are parallel.
  3. Weld the two together and remove the nuts.

Prepare the sensor holders

  • You will need one later which attaches to the arms, so it's suggested you make two.
  • Weld 3.5" of rebar to 3.5" of threaded rod at a right angle, taking care to protect the threads from spatter.

Assembly

Step 1: Mag Drill Holes in Verticals.=

Wanted: Someone to fix the way the numbers reset after I do a bullet point

  1. Gather materials for the “Jig”; this means 6”x12” tubing (52”) and any extra heavy U Channel. If you don't have any laying around, you can use one drawer member, and one spacer on each side.
  2. Clamp the vertical pieces to the "Jig" on each end, with extra U channel in between the tubing and the vertical pieces. See the diagram on the right:
  3. Clamp one horizontal member at each end of the jig.
    • Ensure they are square with the jig by using a large square
    • Clamp using 1 or 2 vise grips on either side.
  1. Transfer Punch thru the holes on B.


HintLightbulb.png Hint: It really helps to label each piece before taking it apart, so that if you end up unbolting the piece later, you'll know exactly where it goes and in what orientation.

  1. Mark where the edge of the horizontal member is in relation to the vertical members on the vertical member. Use a square to mark the same location on the opposite side. Do this on all four locations.
  2. Remove the horizontal members.
  3. Use a Mag-Drill to drill 3/4" holes in each spot you transfer punched.
  4. Flip the jig over so you have access to drill the other holes.
  5. Align the other horizontal members with the marks you previously made, and insure once more that they are square.
  • If it is on the mark on each side, but not square, just get it as close as you can to the marks while insuring it is square.
  1. Clamp the members in place.
  2. Transfer punch them.
  3. Remove them.
  4. Mag Drill them.
  5. Unclamp the verticals from the jig.

Step 2: Assemble top/bottom

  1. Loosely bolt the crossmembers on one side in place.
  2. Square them up with the verticals using a large square.
  • If they're not lining up properly square it up on the top of the cylinder first and tighten those bolts. Then square out the other side and torch out any spots prohibiting the bolts from going thru.
  1. Tighten all of those bolts.
  2. Flip over the frame.
  3. Loosely bolt the crossmembers on this side and square them. Insure the members on the other side are level with this one.
  4. Tighten these bolts.

Step 3: Mag-Drill the holes for the wide cylinder supports and drawer members

  1. Clamp the drawer member centered, (5" for standard CEB, 7" for the "super" CEB) from the upper cross member.
  2. Clamp the wide cylinder support directly below it.
  3. Transfer punch thru those holes.
  4. Mag-Drill 1" holes at these centers.
  5. Flip the frame over and do the same thing on the other side.

Step 4: Torch the roller slots

  • The center of them is located 9 5/16" away from the top of the machine, 2 inches in from one side of the U-Channel.
  • They are to be 1.5" tall, and 5/8" wide.

Step 5: Weld the spacers

  1. With the frame laid down, and one of the drawer members in place, place the spacers on each side. The end of them is to be 5 1/8" away from the upper cross member.
  2. Insure they are parallel with the U-channel and C-clamp in two places for each.
  3. Tack the top in 3 spots.
  4. On the bottom edge, weld the interior inwards as far as you can. This should be an inch or more.
  5. Weld the top 100%.
  6. Grind the top weld flush with the U=channel.
  7. Flip over the frame.
  8. Remove the other drawer member, and repeat steps 3-6.

Step 6: Weld the dirt blockers

  1. Put the dirt blockers in place, so the bottom of them is about 1/8" above the bottom of the upper crossmembers.

<image>

  1. Weld the portion inside of the vertical members, taking care to not weld it to the crossmembers.

Step 7: Fit the main cylinder

  1. Lay the frame down, with all of the crossmembers and drawer members in place except the upper crossmember and drawer member which are facing up.
  2. Place the assembled cylinder lying down so that the press feet are between the spacers. You need to insure that the vertical height is correct, and that the cylinder is centered.
  • The top of the upper press foot should be (4 3/4" for the regular CEB, and 6 3/4" for the "super" CEB) away from the bottom of the upper crossmembers.


HintLightbulb.png Hint: To make sure the cylinder is centered, use a speed square pressed against the cylinder, and a tape measure to the vertical members as shown.
Centercylinder.jpg
  1. Add a 1/8" spacer (big washers work great) under the cylinder, where it contacts the lower crossmember. This insures the cylinder is centered vertically.
  2. Use spray paint to mark the location of the tubing on the crossmember.
  3. Place the other upper crossmember in place, putting bolts thru the holes.
  4. Use spray paint to mark the location of the tubing on the crossmember.
  5. Remove this member and move the cylinder out of the way of the other.
  6. Place one of the DOM tubing pieces in the center of each of the sprayed marks and spray paint around this to mark where you will torch.
  7. Torch around the outside of the ring left by the DOM tubing.
  8. Insure the tubing will go thru each hole. If not, retorch it. Grind off the slag.
  9. Lay the cylinder back down and replace the top crossmember. Place the tubing in the torched holes.
  10. Insure the pin will go thru the tubing and the cylinder. If not, retorch the holes so that it will.
  11. With the pin held in, weld the tubing on the top in place (Youll want to tack it in many places before welding around it.). Then tack it as best you can on the back by hanging the frame off of the table and overhead welding.
  12. Remove cylinder and pin, as well as the two crossmembers.
  13. Fully weld the tubing on both sides. Jump around a lot to minimize any warping on the tube. Block the insides of the tubing so no spatter goes inside.
  14. Replace the crossmembers and the cylinder. Insure the pin still fits and hammer it thru.

To be continued, during the month of August, 2011...

Step 1. Torch or cold-cut channel to size


Step 3

Diagrams

Step 1: Gather the Form Pieces

Form Pieces

Step 2: Put the Form Pieces Together

Form Pieces Together

Step 3: Line the Vertical Beams along the Form and C-Clamp them in Place

Align Vertical Beams

Step 4: Place One Each of the Upper and Lower Cross Beams

Cross Beams

Step 5: Flip the Frame

Flip Frame

Step 6: Place the Remaining Cross Beams

Other Cross Beams


This diagram shows the pieces needed for the frame. Click to enlarge: Feflibframe.jpg