CEB Press/Manufacturing Instructions/Leg Holders: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 1: | Line 1: | ||
{{Template:CEB Press Manufacturing Instructions Navbox}} | {{Template:CEB Press Manufacturing Instructions Navbox}} | ||
[[Image:legholders.jpg|thumb|right|400px| The fabrication steps of the leg holders]]You will need 14 of these per machine. They are required for [[CEB Press/Manufacturing Instructions/Arms - secondary|Arms - secondary]] (8), [[CEB Press/Manufacturing Instructions/Feet|Feet]](4), [[CEB Press/Manufacturing Instructions/Frame with main cylinder|Frame with main cylinder]] (2) | [[Image:legholders.jpg|thumb|right|400px| The fabrication steps of the leg holders]]You will need 14 of these per machine. They are required for [[CEB Press/Manufacturing Instructions/Arms - secondary|Arms - secondary]] (8), [[CEB Press/Manufacturing Instructions/Feet|Feet]](4), [[CEB Press/Manufacturing Instructions/Frame with main cylinder|Frame with main cylinder]] (2) | ||
<html><iframe src="http://sketchup.google.com/3dwarehouse/mini?mid=9ede5ca4cc4cd2301211da1f85706ccd&etyp=sw&width=400&height=300" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" width="400" height="300"></iframe></html> | |||
==Tools Required:== | ==Tools Required:== |
Revision as of 17:14, 12 December 2011
|
You will need 14 of these per machine. They are required for Arms - secondary (8), Feet(4), Frame with main cylinder (2)
Tools Required:
- Torch
- Welder
- Grinder
Materials Required:
- 2 1/2” x 2 1/2" x 3/16" thick square steel tubing – 6” long (1)
- 3/4” nut (1)
- 3/4” x 1.5” bolt (1)
Fabrication Instructions:
- Torch a 3/4” hole in the center of one of the faces of the tubing; make sure it's large enough for a 3/4” bolt.
- Weld the nut over the hole, ensuring the nut is level, and the hole is clear. Make sure no spatter goes into the threads by covering the top of the nut.
- Thread the bolt into the nut.