CEB Press/Manufacturing Instructions/Arms - primary: Difference between revisions
Jump to navigation
Jump to search
Line 38: | Line 38: | ||
== Fabrication Steps == | == Fabrication Steps == | ||
Mark and punch all holes. | |||
Revision as of 05:02, 14 December 2011
|
The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the Brickholder plate, the Dirt-keeper plate, the Controller Mount, and the Valve Mount.
Tools Required
Hole punch with 13/16" and 3/4" dies
Materials Required
- 2 pieces 72" long - 4"x6"x1/2" angle steel
Diagrams
Left
Right
Fabrication Steps
Mark and punch all holes.