CEB Press/Manufacturing Instructions/Arms - secondary: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 24: | Line 24: | ||
== Fabrication Steps == | == Fabrication Steps == | ||
#Punch the holes in each arm. They are symmetrical | #Punch the holes in each arm. They are symmetrical. | ||
#Place the leg holders in their proper locations. | #Place the leg holders in their proper locations. | ||
#*They go on the 4" side of the angle. | #*They go on the 4" side of the angle. | ||
#*They are symmetric. See Diagram for placement on each end. | #*They are symmetric. See Diagram for placement on each end. | ||
#Make sure they are square with the angle iron and centered vertically. | #*Make sure they are square with the angle iron and centered vertically. | ||
# | #Weld them to the angle. | ||
Revision as of 18:20, 14 December 2011
Main > Housing and construction > CEB Press > CEB press building instructions
|
The secondary arms connect the primary arm/frame assembly to the legs to support the structure.
Tools Required
- Cutting Torch
- Angle Grinder
- Welder
Materials Required
- 2 pieces 72" long - 4"x6"x1/2" angle steel
- 1 piece 3"x3"x1/2" steel
- Leg Holders(8)
Diagrams
Fabrication Steps
- Punch the holes in each arm. They are symmetrical.
- Place the leg holders in their proper locations.
- They go on the 4" side of the angle.
- They are symmetric. See Diagram for placement on each end.
- Make sure they are square with the angle iron and centered vertically.
- Weld them to the angle.