Category:Status: Difference between revisions
Jump to navigation
Jump to search
Negligiblek (talk | contribs) No edit summary |
|||
Line 28: | Line 28: | ||
*[[Steam Engine Construction Set]] needs work. Engine design work is not yet complete as of 2.7.09. | *[[Steam Engine Construction Set]] needs work. Engine design work is not yet complete as of 2.7.09. | ||
*[[Flash Steam Generator]] needs Project Leader. | *[[Flash Steam Generator]] needs Project Leader. | ||
*[[Pyrolysis Reactor]] begins with Negilgiblek creating a simple prototype. | |||
=Goals= | =Goals= | ||
*We need people to work on projects | *We need people to work on projects |
Revision as of 07:03, 18 March 2009
Introduction
Here is the present status, as of Feb. 7, 2009 - a 2 month plan. See the status of individual projects below.
Details
Some more details for the 2 month plan above are:
Habitat construction:
- Nathan is working on the Solar Microhut design.
- LifeTrac upgrades involve larger motor mount bolts, a one day task.
- MicroTrac is in progress.
Agroecology:
- Vegetable Plan needs to be outlines for raised bed chinampa system. We can make reaised beds with various scrap material from on-site.
- MicroTrac needs to be designed. We're presently looking at building it, with a 12-15 hp off-shelf diesel engine. We will have chipper, tiller, mower, and baler attachement.
- Site Plan - permacultural design of entire facility needs to be drawn out, including 30 connected Solar Microhuts.
Fabrication:
- Metal melt-down of metal scrap, such as broken tractors replaced by LifeTrac - by developing the metal melting furnace Foundry. This is a high priority item, needs project leader.
- Torch Table needs to be built, 3D design is in review.
- Open Source Lathe required a day to draw up in 3D, and is to be in-sourced to True Fans.
Energy:
- Solar Power Generator - see Distillation on the topic
- We are now finishing the Babington Burner application to the hybrid masonry stove. Marcin is project leader.
- Steam Engine Construction Set needs work. Engine design work is not yet complete as of 2.7.09.
- Flash Steam Generator needs Project Leader.
- Pyrolysis Reactor begins with Negilgiblek creating a simple prototype.
Goals
- We need people to work on projects
- Need more buildings for people
- need infrastructure for buildings for people
- Funding for basic infrastructure by March 2009
- So we need $8000 to jump start infrastructure
- Funding for basic infrastructure by March 2009
- need food for people
- need production tools for projects
Pages in category "Status"
The following 14 pages are in this category, out of 14 total.