CEB Press/Manufacturing Instructions/Frame with main cylinder

From Open Source Ecology
Jump to navigation Jump to search

Tools Required

  • Torch
  • Hole Punch
  • Mag Drill
  • 1/2” Allen Wrench

Materials Required

Steel

  • 6” Heavy (7/16”) U-Channel- 274 1/2”
    • A- 54” (2); Vertical Members
    • B- 20 3/4” (4); Horizontal Members
    • C- 28 3/4” (2); Drawer Members
    • D- 13” (2); Spacers
  • 2”x2”x1/4” Angle Iron:
    • E1- Cylinder Cross Supports: E1- Horizontals: 20 3/4” (2)
    • E2- Cylinder Cross Supports: E2- Verticals: ??
    • F- 6” (2); Dirt Blockers
  • 1 1/2” DOM Roundstock: 12”; Cylinder Pin: 8 1/2”, Press Foot Filler: 3 1/2”
  • 1 1/2” Inter Diameter DOM Tubing: 1 1/4” (2); Pin Receptors
  • 1”x4” Plate: Lower Press Foot: 10” (1)
  • 1”x6” Plate: Upper Press Foot: 12” (1)
  • 2” U-Channel: 1.5” (2); Cylinder Spacers
  • 1” Pipe: 1.5” (2); Cylinder Spacers
  • 1/4”x1” Flatbar: 13” (1); Magnet holder
  • 3/8” Rebar: 3.5” (2); Sensor Holder
    • For Optional “Jig”: 6”x12” Tubing: 52”

Nuts and Bolts

  • 3/4”x1.5” Bolts (28)
  • 3/4” x 2.5” Bolts (6)
  • 3/4” Steel Nuts (9)
  • 3/4” Galvanized Nuts (40)
  • 3/4” Threaded Rod: 16”

Hydraulics

  • 5”x12” 3000 PSI Hydraulic cylinder Buy (1)
  • 3/4” to 3/4” Hydraulic Coupler (2)
  • 3/4” Female Quick Coupler (1)
  • 3/4” Male Quick Coupler (1)

Fabrication Instructions:

Step 1: Punch the holes in the horizontal members (A) and in the drawer members (B)

Step 1
  • In the horizontal members, the holes should be 7/8” in from the long side, and as close as you can get them to the wall of the U-channel. There are 4 holes in each piece.
  • In the drawer members, the holes should be 4 7/8” in from the long side, and as close as you can get them to the wall of the U-Channel. There are 4 holes in each piece.

Step 2: Mag Drill Holes in Verticals.

  1. Gather materials for the “Jig”; this means 6”x12” tubing (52”) and any extra heavy U Channel. If you don't have any laying around, you can use one drawer member, and one spacer on each side.


To be continued, during the month of August, 2011...

Step 1. Torch or cold-cut channel to size


Step 3

Diagrams

Step 1: Gather the Form Pieces

Form Pieces

Step 2: Put the Form Pieces Together

Form Pieces Together

Step 3: Line the Vertical Beams along the Form and C-Clamp them in Place

Align Vertical Beams

Step 4: Place One Each of the Upper and Lower Cross Beams

Cross Beams

Step 5: Flip the Frame

Flip Frame

Step 6: Place the Remaining Cross Beams

Other Cross Beams


This diagram shows the pieces needed for the frame. Click to enlarge: Feflibframe.jpg

Video Explantion