CEB Press/Manufacturing Instructions/Arms - primary

From Open Source Ecology
Jump to navigation Jump to search
Farmewitharms.jpg

The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the Brickholder plate, the Dirt-keeper plate, the Controller Mount, and the Valve Mount.

Tools Required

Hole punch with 13/16" and 3/4" dies

Materials Required

  • 2 pieces 72" long - 4"x6"x1/2" angle steel

Diagrams

Left

Right

Primarynorm.png Monsternorm.png

Fabrication Steps

Mark and punch all holes.