CEB Press/Manufacturing Instructions/Arms - secondary

From Open Source Ecology
Jump to navigation Jump to search

Main > Housing and construction > CEB Press > CEB press building instructions

Secondaryarms.jpg The secondary arms connect the primary arm/frame assembly to the legs to support the structure.

Tools Required

  • Cutting Torch
  • Angle Grinder
  • Welder

Materials Required

  • 2 pieces 72" long - 4"x6"x1/2" angle steel
  • 1 piece 3"x3"x1/2" steel
  • Leg Holders(8)

Diagrams


2ndarmweldover.png

Fabrication Steps

  1. Punch the holes in each arm. They are symmetrical.
  2. Place the leg holders in their proper locations.
    • They go on the 4" side of the angle.
    • They are symmetric. See Diagram for placement on each end.
    • Make sure they are square with the angle iron and centered vertically.
  3. Weld them to the angle.