CEB Press/Manufacturing Instructions/Hopper sheet metal
Jump to navigation
Jump to search
|
Tools Required
- Torch
- Welder
- Hole punch with 3/4" dies
Materials Required
- Door Hinges (12)
- 1/2" x 1 1/2" bolts (12)
- 1/2" washers (12)
- 1/2" lockwashers (12)
- 1/2" nuts (12)
- one 5X10 or two 4X8 sheets of 1/8" steel
- 24' of 1/8" thick x 3" or 4" flatbar: Cut into 3' (8 total) pieces.
Diagrams
old design DXF File
Fabrication Steps
Note: there are holes in the above diagrams which won't be torched until the hopper installation.
Prepare the hinge plates
- Punch 3/4" holes in 4 of the hinge plates as shown.
- Weld a holey hinge plate, a non-holey hinge plate and 3 hinges together as shown.
- Make sure the side of the hinge that sticks out most is on the top; this way it won't interfere with the hopper metal below when installing the hopper.
- Make 3 more of these.
Mounting the hinge plates to the hopper metal
- Torch the hopper shapes.(See diagrams above) Grind away any excess slag.
- Punch all of the holes shown.
- Place 1/2" bolts thru the side pieces and weld them.
- Make sure you are making them mirror images of eachother.
- Bolt the hinge plate assemblies to the side pieces using a washer, lock washer, and nut on each bolt.