Mon Sept 16, 2013

  • To Do - order APAC 816.632.2319 16 tons of 3/4" washed gravel
    • FROM AUDREY: Marcin said that "cleaned" gravel is fine...APAC does not have washed gravel, only cleaned. They can deliver (most likely) same day if we call at 7am; otherwise, next day. They are open Mon-Fri from 7-3:30. Cost for 3/4" cleaned gravel: $14.90/ton plus tax, delivery charge is $4.84/ton. A truck typically holds 18-19 tons. Also...3/8" gravel is $13.85/ton (for use on pathways, etc). We will need to wait until the ground dries.
  • MoKan order picked up
  • Grainger parts returned
  • Sprocket dropped off at Sweiger Shop for machining - no additional parts requested, no chains requested
  • BofA debit cards activated

Sun Sept 15, 2013

Fri Sept 13, 2013

  • Addressed connectivity problems, see OSE Internet and Phone - CenturyLink
  • Shuttleworth Pitch received, signed and returned
  • Maysville Tax Service - Shirley Marshall - (816) 449-5344, updated Vendor Database
    • September 23, 2013 meeting - research BofA Quicken Book requirements prior to meeting
  • Wheel Rims (4) ordered from Justin Fuston, see Vendor Database
  • Menard's (816-901-3061) order, placed by Chris, complete for microhouse build, order does not include 12 pieces of 10' and 1/2" rebarb, order is expected to arrive on Monday, September 16, updated Vendor Database
  • Two Honda generators picked up, TCM has 1 of 2
  • Monday, September 16th KC run - MoKan - bolts, Grainger - Return box, Justin Fuston - wheel rims
  • Mailed outstanding admin for James Slade
  • Updated internal OSE Budget tab Shuttleworth Budget pitch, addressing questions raised within spread sheet, corrected discrepancy identified via emails
  • 1st Prototyping Invoice to Shuttleworth, then edited and sent update (Invoice 1a)
  • Added Received and Accepted status to Material, RFQ, and Work Requisition
  • See LifeTrac 6 Discussions

Thur Sept 12, 2013

  • (Internal document) See Shuttleworth Budget Pitch Tab in OSE Budget

Wed Sept 11, 2013

  • Followed up with Cloverdale regarding wheel hubs quote, no need for quote
  • MoKan (816) 221-2064 September 9th order will arrive earliest on September 12th, but probably September 13th
  • Wednesday Blog Update Compiling Document
  • Updated LifeTrac 6 Material Requisition Form V.09-09-13 with MoKan order and Jason Fuston information regarding wheel hubs order - Material, RFQ, and Work Requisition
  • Added Audrey's routing product to Routing - added internal document disclaimer, but removed, no reason this shouldn't be an Open Source document
  • Corrected contract, added to Routing, and notified all stakeholders to review and provide concur or non-concur, feedback provided
  • Contacted Maxwell Health again, scheduled 2PM CST call with Andrew Brit (617) 329-9364
    • Updated Vendor Database with Maxwell Health info
  • Add Gary's Bobcat Q Attach to Routing tracker
  • Spoke with Maxwell Health, provided census information - representative is providing quotes
  • Added "Cut off Saws (HARBOR FREIGHT) and Bolts (MOKAN) - Go or send someone on Friday, bring Debit Cards to activate, MoKan receipt and Grainger return item." and Routing to Routine Executive Staff Meeting
  • Creating Shuttleworth Budget Pitch with a focus on expected expenses, not past expenses or budgeted numbers.

Tues Sept 10, 2013


Goals for the Week:

  1. Benefits - last week complete goal, but received midcourse correction when health care quotes were submitted
  2. Source Book-keeper and Tax expert
  3. Budget to Shuttleworth

Recap Last Week:

  1. Continue working ADP, third week
  2. Step Instructions and Sample Deliverables ongoing

Mon Sept 09, 2013

  • Processed RunADP - 02-18 September
  • Cloverdale confirms receipt of payment and steel pick up at 1015AM today. Expect delivery of steel at 1PM CST to FeF.
  • Confirmed with Lucas that LifeTrac 6 requires two 27hp Power Cubes; one 50hp Power Cube will not work due to pump requirements
  • Called Brother's Welding 816 253 9748 - looking for the contact information for a local CNC torch table
  • Logistics and parts ordering
    • Fastenel - 90 bolts/nuts in the workshop that need to be returned. The order was placed under Cropanganda Films, LLC. Use Siku Thompson as a reference. The funds should be returned to the credit card used to purchase the bolts. Address - 3520 Pear St St Joseph, MO 64503 Phone: 816-527-0172
    • MoKan - Pick up bolts. Receipt is in the office, located on OM desk - currently easy find since completed office admin/filing on (Thursday September 5). Address: 1508 E 9th St, Kansas City, MO 64106 Phone:(816) 221-2064
    • Grainger - Return box located on black bookshelf in office. Receipt or packing invoice in box. Address - 2300 E. 18TH St. Kansas City, MO 64127-2543 Phone: (816) 241-5600
    • Sweiger Shop - Pick up steel. Address: 5502 NE Dallas Rd, Weatherby, MO 64497 Phone:(816) 449-5582
  • LifeTrac 6 - added Material Requisition, FRQ, and Work Form V.09-06-13
  • Logged V.09-06-13 in Material, RFQ, and Work Requisition as form 101
  • Mat, RFQ, and Work Form V.09-06-16, all but hub mounting plates sent to Mokan at mokanfast@msn.com for sourcing.
  • Updated Vendor Database with Mokan's email address (not online), Brother's Welding contact information, and Jason Fuston's phone and email address (not found online)
  • Wheel Hub Mounting Plates
  • Left a message for Jason Fuston (816) 271-3692 - potential machinist located in Amity
    • Jason looking at design today, will return with quote and estimated time to machine
    • Forwarded design to Cloverdale for quote and estimated time to machine
  • Dancing Rabbit's Aaron Murphy - potential DPV and past contributor
  • Updated Operations 2013 with additional tabs (see tabs for specific updates)
  • Coordinated hardware pick up with MoKan
  • Routine Executive Staff Meeting - changed from Sept 9th to Sept 10th and added Design Sprint note
  • Maxwell Health responded to Friday's inquiry, coordinating meeting for Tuesday or Wednesday (Sept 9th or 10th)
  • Removed the following from Volunteer
    • Non-technical
  • Created Outdated Information: Volunteer

Sat Sept 07, 2013

  • Updated Bed Logistics
  • PL - following up with James Wise and Tom Griffing regarding design approval
  • PL - HabLab clean sweep needed
  • BOL forwarded to ED, PL, and DPV for review/confirmation
  • DM arrival and departure dates for the microhouse build - requested input
  • Internal document - Microhouse build invoice

Fri Sept 06, 2013

  • Healthcare mid-course correction - Per Colby's feedback following his review of quotes provided, I submitted a request to Maxwell Health for assistance with compiling health care and benefit packages.
  • Confirmed with Cloverdale Manufacturing that steel order is ready for pick up Monday (September 9).
  • Confirmed with Unishippers and Freightquote prior bids. Unishippers's bid increased and Freightquote's bid remained the same. Unishippers expected to source a truck within 2-3 days. Freightquote expected to source a truck within 1 day and promised to report status on Monday (September 9). Freightquote sourced a truck same day, Friday (September 6).
  • Provided complete invoice payment to Cloverdale - challenging due to lack of internet in Erie, PA (current location) - significant note: Cloverdale no longer accepts PayPal payments, only wire transfers
  • Freightquote followed up with Bill of Lading and coordinated with Cloverdale regarding logistics details. No need to coordinate between the shipping broker and vendor.
  • Confirmed with incoming DPV, arriving Wednesday or Thursday week of September 9 - POV

Thurs Sept 05, 2013

  • Cloverdale steel order ongoing due to machining issues. Cloverdale to provide pick up date as soon as possible.
  • Executive Staff Meeting with Catherine scheduled for Tuesday at 5PM CST, scheduled in OSE Schedule
  • Separated funds spend on CEB and Hablab consumables on three of the enclosed spreadsheet, OSE Budget
  • Held Routine Executive Staff Meeting and updated slides for next meeting September 09
  • CEB contract reworked
  • Admin filed in HabLab Office

Wed Sept 04, 2013

Tues Sept 03, 2013



Goals for the Week:

  1. Benefits
  2. Step Instructions and Sample Deliverables

Recap Last Week:

  1. Continue working ADP, third week
  2. Step Instructions ongoing

Mon Sept 02, 2013

Sun Sept 01, 2013

Archived Katie Log August 2013

Archived Katie Log July 2013

Archived Katie Log June 2013

Archived Katie Log March-May 2013