CEB Press/Manufacturing Instructions/Soil loading drawer
|
Tools Required
Materials Required
ID | Quant | Type | Length | Total | Name | Detail |
Diagrams
The alphanumeric identifiers (i.e. S24) match up with the ID column in the Materials Required section
Fabrication Steps
(note: part numbers refer to the recently-published parts list on the Bill of Materials page)
Step 1: Weld Press Plate and Spacer Assembly:
- a) Lay the spacer tube(S24) on top of the press plate(S26), align the sides and make the back edge flush.
Warning: Ensure all edges are tight and squared; this piece is critical, it must be a uniform height throughout the entire item. Grind off any imperfections.
- b) Tack weld the two together in many places (at least 3 on each side) to ensure nothing will warp.
- Double check everything for squareness!!
- c) Weld the two together on all edges where they touch.
Hint: It is a good idea to weld in 1” or 2” increments, skipping around to different places to prevent warpage.
- You will need to weld multiple layers where the tubing is rounded.
- d) Grind off any weld which prevents the vertical support (S31) from being square and flush with both the spacer tube and the press plate.
- e) Weld the vertical support to the press plate and spacer tube assembly.
- f) Grind down the welds on the open end of the tube so they are flush with the rest of the tube.
Step 2: Tack Sides
- a) Lay the spacer/press plate assembly down so the press plate is touching the table.
- b) Align side pieces(S29) with spacer and press plate assembly. Insure the two are square vertically and horizontally with the spacer, and that everything is touching the table.

- Also, it may help to use paper shims between the sides and the tube to properly space them.
- c) Tack the sides to the tube on all sides in multiple places except where it is touching the table. Add a few 1" seams to prohibit them from moving.
Step 3: Tack back
- a) Place the back piece (S22).
- b) Tack the back piece in a few spots, with a 1" seam on each side.
Step 4: Tack Roof, Inner Rails
- a)Grind off the welds for the back and side pieces so that the entire drawer is flush.
- b)Flip the drawer over and tack the sides from the top.
- c) Place the roof(S25) and inner rails(S27) in their respective places. Ensure inner rails are perfectly parallel (varying no more than a 16th of an inch) and square throughout the entire length.
- d) Tack them in multiple places except where they are touching the table.
Step 5: Tack outer rails (S28)
Warning: Ensure they are perfectly parallel; otherwise they will leave the roller guides. Insure it varies no more than 1/16" over the entire length.
- Tack them in multiple places except where they are touching the table.
Step 6: Weld entire drawer
- All the seams should be completely welded except the difficult to reach places between the inner and outer rails, those can be welded about 50%.
- You may want to grind off the welds in between passes around the drawer to allow it to cool.
Step 7: Grind the entire drawer flush
Warning: There cannot be any outstanding bumps or welds anywhere; the drawer will be sliding in and out of a tight spot and bumps will catch on the frame crossmembers.
- Make sure there's no welding spatter where the rollers will be rolling. Grind any off with a small grinder.
Step 8: Check the Rails
- The rails likely got warped outwards on the side with the back while you were welding.
- If they are not still paralell, you will need to pinch them inwards so that they are. You can do so using two C-Clamps.