CEB Press/Manufacturing Instructions/Controller Mount
Jump to navigation
Jump to search
Main > Housing and construction > CEB Press > CEB press building instructions
|
The controller mount attaches the controller box to the primary arms.
Tools Required
- Hole punch with 13/16" die.
- Drill press with 1/4" or larger bit.
- Welder
Materials Required
- 1/4" x 6" flatbar: 15"
- 1/4" x 2" flatbar: 12"
Diagrams
Fabrication instructions
- Find your controller box and locate its mounting holes on the back. Use spray paint to spray a nice wet coating over the hole locations, then press your 6x15 plat to it, square and as close to the top as you can get it, to mark the hole locations.
- Drill the small holes (you might want to oversize them a bit, as it very difficult to get them in the perfect location.
- Punch 13/16 holes 1" in and 1" up at the bottom of the plate.
- Weld the 2" flatbar perpendicular to the plate on the back. The bottom should be flush with it, so the top hole for the controller is still accessible.