CEB Press/Manufacturing Instructions/Valve Mount
Jump to navigation
Jump to search
Main > Housing and construction > CEB Press > CEB press building instructions
|
The valve mount holds the hydraulic solenoid valves to the primary arm.
Tools required
- Hole puncher with 13/16" Dies
- Drill Press with 1/4" or larger bit.
Materials required
- 1/4"x6" flatbar: 12"
Diagrams
Fabrication instructions
- Find your hydraulic solenoid valve and locate its mounting holes on the back. Put the plate under it so that the mounts on the valve align with the top of the plate.
- Use spray paint to mark the holes on the mount's location to the 6"x12" plate. Center punch them.
- Drill the holes to at least a 1/4" large (you might want to oversize them a bit, as it very difficult to get them in the perfect location.)
- Punch 13/16" holes at the bottom of the plate.