Seed Home 2 Utility Panel: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 40: | Line 40: | ||
|data8 = Describe basic construction technique and materials | |data8 = Describe basic construction technique and materials | ||
|header9 = | |header9 = | ||
|label9 = Productivity | |label9 = Build Productivity | ||
|data9 = Designed so that panels + utility channel allow for 2 hour install of electricity, and Stub Module with panels allow 2 hr install of water, waste, and vent. | |data9 = Designed so that panels + utility channel allow for 2 hour install of electricity, and Stub Module with panels allow 2 hr install of water, waste, and vent. | ||
|header10 = Completion Status | |header10 = Completion Status |
Revision as of 18:54, 5 October 2020
|
Development
Concept
Technical
Part Library
Visual History:
Error creating thumbnail: File missing
Error creating thumbnail: File missing
Gallery:
- Error creating thumbnail: File missing
Utility Gas Meter. - FreeCAD - File:Gasmeter.FCStd
- Error creating thumbnail: File missing
Utility Power Meter. - FreeCAD - File:Powermeter.FCStd
More
- Sewer connection has 3 fees: one is excavation, 2 is permit, 3 is connection fee - which can be from $300 to $20k. Sewer near flint - [1] costs $3k for connection. Connection to sewer in Salem, Il - [2] - $300. An incinerating toilet becomes a good idea - Incinerating toilet - [3] only $2k