Seed Home 2 Utility Panel: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
(5 intermediate revisions by the same user not shown) | |||
Line 26: | Line 26: | ||
|header4 = | |header4 = | ||
|label4 = Water | |label4 = Water | ||
|data4 = Stubbed out to Sharkbite quick-connect | |data4 = Stubbed out to Sharkbite quick-connect shutoffs | ||
|header5 = | |header5 = | ||
|label5 = Stub-out module | |label5 = Stub-out module | ||
Line 36: | Line 36: | ||
|label7 = Power/Gas Panel | |label7 = Power/Gas Panel | ||
|data7 = Accepts gas meter, power meter, and interior breaker panel. | |data7 = Accepts gas meter, power meter, and interior breaker panel. | ||
|header8 = | |header8 = | ||
|label8 = Construction | |label8 = Construction | ||
|data8 = Describe basic construction technique and materials | |data8 = Describe basic construction technique and materials | ||
|header9 = | |header9 = | ||
|label9 = Productivity | |label9 = Build Productivity | ||
|data9 = | |data9 = Designed so that panels + utility channel allow for 2 hour install of electricity, and Stub Module with panels allow 2 hr install of water, waste, and vent. | ||
|header10 = Completion Status | |header10 = Completion Status | ||
|label10 = | |label10 = | ||
Line 182: | Line 181: | ||
=Concept= | =Concept= | ||
See [[Seed Home 2 Utility Panel Conceptual Design]] | |||
=More= | =More= |
Latest revision as of 19:01, 5 October 2020
|
Development
Concept
See Seed Home 2 Utility Panel Conceptual Design
More
- Sewer connection has 3 fees: one is excavation, 2 is permit, 3 is connection fee - which can be from $300 to $20k. Sewer near flint - [1] costs $3k for connection. Connection to sewer in Salem, Il - [2] - $300. An incinerating toilet becomes a good idea - Incinerating toilet - [3] only $2k