{{Warning|The documentation for the CEB Press is undergoing a thorough overhaul.  CAD models and written directions are presently obsolete.  For more information, see [[Talk:CEB_Press#Documentation_overhaul_in_progress]].  When the models, specifications and text on this article have been thoroughly reviewed, updated when necessary, and confirmed as whole and accurate, this warning may be removed.}}
{{Warning|The documentation for the CEB Press is undergoing a thorough overhaul.  CAD models and written directions are presently obsolete.  For more information, see [[Talk:CEB_Press#Documentation_overhaul_in_progress]].  When the models, specifications and text on this article have been thoroughly reviewed, updated when necessary, and confirmed as whole and accurate, this warning may be removed.}}
The following steps can be done in any order before beginning the assembly of the main frame.
The following steps can be done in any order before beginning the assembly of the main frame.
<html><iframe src="http://sketchup.google.com/3dwarehouse/mini?mid=c94fa5ac3a7bcccd1211da1f85706ccd&etyp=im&width=400&height=300" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" width="400" height="300"></iframe></html>
=Tools Required=
=Tools Required=
*Welder
*Welder
Line 16: Line 17:
**B- 20 3/4” (4); Horizontal Members
**B- 20 3/4” (4); Horizontal Members
**C- 28 3/4” (2); Drawer Members
**C- 28 3/4” (2); Drawer Members
*For the "Monster" CEB: 6" Light (1/4") U-Channel: 41.5" total; Wide cylinder support horizontal: 20 3/4" (2)
**For the normal CEB: 2"x2"x1/4" Angle: 41.5"; Wide cylinder support horizontal: 20 3/4" (2)
*2"x2"x1/4" angle: 11.5"; Wide cylinder support verticals: 5.75" (2)
*3” U-Channel: 3" total: 1.5” (2); Thin cylinder Spacers
*3” U-Channel: 3" total: 1.5” (2); Thin cylinder Spacers
*1” Pipe: 3" total: 1.5” (2); Thin cylinder Spacers
*1” Pipe: 3" total: 1.5” (2); Thin cylinder Spacers
Line 26: Line 24:
==Nuts and Bolts==
==Nuts and Bolts==
Note: we suggest using steel nuts, because these will be welded, and the galvanized nuts release toxic gases when welded. You can use galvanized instead if necessary, but its not recommended.
Note: we suggest using steel nuts, because these will be welded, and the galvanized nuts release toxic gases when welded. You can use galvanized instead if necessary, but its not recommended.
*3/4" Steel Nuts (6 normal CEB, 10 monster CEB)
*3/4" Steel Nuts (4 normal CEB, 8 monster CEB)
**Drawer members: (2)
**Drawer members: (2)
**Wide cylinder supports: (2)
**Thin cylinder supports: (2)
**Thin cylinder supports: (2)
**Monster CEB only: (4) Drawer adjuster bolts
**Monster CEB only: (4) Drawer adjuster bolts
*3/4" Galvanized Nuts (9)
*3/4" Galvanized Nuts (7)
**Magnet holder (1)
**Magnet holder (1)
**Drawer adjusters (4)
**Drawer adjusters (4)
**Sensor holders (2)
**Sensor holders (2)
**Wide cylinder supports (2)
*3/4” Threaded Rod: (20.75” total normal ceb) (35.75" total monster ceb)
*3/4” Threaded Rod: (20.75” total normal ceb) (35.75" total monster ceb)
**Magnet holder: 1.25" (1)
**Magnet holder: 1.25" (1)
Line 59: Line 55:
All need holes marked. The drawer members need holes torched, and nuts welded to them. The vertical members need holes punched, nuts welded, and holes torched.
All need holes marked. The drawer members need holes torched, and nuts welded to them. The vertical members need holes punched, nuts welded, and holes torched.
===Marking===
===Marking===
*Mark the holes in the horizontal members and drawer members as shown in the diagram above. Center punch them.
*Mark the holes in the '''horizontal members''' and '''drawer members''' as shown in the diagram above. Center punch them.
DON'T PUNCH THEM! They will be mag-drilled later.
DON'T PUNCH THEM! They will be mag-drilled later.
===Punching===
===Punching===
*See the diagrams for the '''vertical members''' hole locations, as they vary between the "normal" and "monster" CEB's. They will need to be mirror images, but only one vertical will have the sensor hole.
*See the diagrams for the '''vertical members''' hole locations, as they vary between the "normal" and "monster" CEB's. They will need to be mirror images, but only one vertical will have the sensor hole.
Line 86: Line 83:
[[Image:adjustmentnut.jpg|thumb|Adjustment bolt and nut configuration]]
[[Image:adjustmentnut.jpg|thumb|Adjustment bolt and nut configuration]]
*For the '''Drawer Members''', Put the nuts and bolts in thru the U-channel and welded nut, as shown in the image.
*For the '''Drawer Members''', Put the nuts and bolts in thru the U-channel and welded nut, as shown in the image.
==Prepare the wide cylinder supports==
[[Image:widecylindersuppmonster.jpg|thumb|left|The "monster" wide cylinder supports]]
[[Image:widecylindersuppnorm.jpg|thumb|The "normal" wide cylinder supports]]
#For the "Normal CEB," torch 3/4" holes in the angle for the cylinder supports in the same manner as with the horizontal members.(19" apart, 3/4" diameter)
#*For the monster, don't worry about the holes, you'll mag-drill them later.
#Weld the 2"x2" angle (5.75") centered and squared on one side of the U-Channel(for "monster") or angle (for "normal", weld it to the side without the holes).
#Torch a hole (3/4" for "normal") (1" for "monster") away from the end of the 2"x2" for a 3/4" bolt and grind it clean.
#Place a steel nut over the hole and insure it is clear for a bolt and flush.
#Weld the nut in place.
#Put a galvanized nut on a 3/4"x2.5" bolt and thread through the welded nut on each side.


==Prepare the thin cylinder supports==
==Prepare the thin cylinder supports==

Latest revision as of 03:26, 16 December 2011

Warning.png Warning: The documentation for the CEB Press is undergoing a thorough overhaul. CAD models and written directions are presently obsolete. For more information, see Talk:CEB_Press#Documentation_overhaul_in_progress. When the models, specifications and text on this article have been thoroughly reviewed, updated when necessary, and confirmed as whole and accurate, this warning may be removed.

The following steps can be done in any order before beginning the assembly of the main frame.

Tools Required

  • Welder
  • Torch
  • Punch with 3/4" dies
  • Angle Grinder
  • Big square
  • Speed square

Materials Required

Steel

  • 6” Heavy (7/16”) U-Channel- (246.5" Monster CEB) (226.5" Normal CEB)
    • A- (53” for Monster)(43" for normal) (2); Vertical Members
    • B- 20 3/4” (4); Horizontal Members
    • C- 28 3/4” (2); Drawer Members
  • 3” U-Channel: 3" total: 1.5” (2); Thin cylinder Spacers
  • 1” Pipe: 3" total: 1.5” (2); Thin cylinder Spacers
  • 1/4”x1” Flatbar: (13” for Monster)(9" for normal) (1); Magnet holder
  • 3/8” Rebar: 7" total: 3.5” (2); Sensor Holders

Nuts and Bolts

Note: we suggest using steel nuts, because these will be welded, and the galvanized nuts release toxic gases when welded. You can use galvanized instead if necessary, but its not recommended.

  • 3/4" Steel Nuts (4 normal CEB, 8 monster CEB)
    • Drawer members: (2)
    • Thin cylinder supports: (2)
    • Monster CEB only: (4) Drawer adjuster bolts
  • 3/4" Galvanized Nuts (7)
    • Magnet holder (1)
    • Drawer adjusters (4)
    • Sensor holders (2)
  • 3/4” Threaded Rod: (20.75” total normal ceb) (35.75" total monster ceb)
    • Magnet holder: 1.25" (1)
    • Sensor holders: 3.5" (2)
    • Thin cylinder support bolts: 6.25" (2)
    • Monster CEB only: Drawer adjuster bolts: 3.75" (4)
  • 3/4"x2.5" Bolts (Normal CEB: 6, Monster: 2)
    • Wide cylinder supports: (2)
    • Normal only: Drawer adjuster bolts (4)


Diagrams

The holes in the horizontal members:
Horizontalholes.png
The holes in the drawer members:
Drawerholes.png
Monsterverticals.gif
Normalverticals.gif
Nutplacement.png

Fabrication Instructions

Prepare the horizontal members(B), vertical members (A) and the drawer members (C)

All need holes marked. The drawer members need holes torched, and nuts welded to them. The vertical members need holes punched, nuts welded, and holes torched.

Marking

  • Mark the holes in the horizontal members and drawer members as shown in the diagram above. Center punch them.

DON'T PUNCH THEM! They will be mag-drilled later.

Punching

  • See the diagrams for the vertical members hole locations, as they vary between the "normal" and "monster" CEB's. They will need to be mirror images, but only one vertical will have the sensor hole.

Torching

Vertical Members
The roller slots need to be torched. This is where the rollers bolt to the frame. See diagram.

  • The center of them is located 9 5/16" away from the top of the machine, 2 inches in from one side of the U-Channel of the vertical members. This side must be the side which ejects the bricks. Label it so. Keep in mind the vertical members are mirror images of eachother, so don't make the same holes.
  • They are to be 1.5" tall, and 5/8" wide.
  • Grind away all slag.

Drawer Members

  • Torch holes for 3/4" bolts as shown in the diagram.
  • Grind away the slag.

Welding

Preparing to weld the adjustment nuts

Drawer Members

  • Weld 3/4" nuts to the outside of the U channel where the holes are torched.
    • Weld it with a bolt coming thru the other side so it protects the threads and so you know the nut won't get off center.
  • Grind away any spatter between the bolts.

Monster only: Adjustment bolts

  • Make (4) 3/4" x 3.5" bolts using 3.75" threaded rod and steel nuts. See Making Bolts.

Assembly

File:Adjustmentnut.jpg
Adjustment bolt and nut configuration
  • For the Drawer Members, Put the nuts and bolts in thru the U-channel and welded nut, as shown in the image.

Prepare the thin cylinder supports

The thin cylinder supports.
  • Weld some 3/4" ID pipe (3/4" to 1") to the 3" U-channel, in the center. 4-8 good tacks is sufficient.
  • Make 2 6" long 3/4" bolts, by using a nut and 6.25" of threaded rod. See Making Bolts.

Prepare the magnet holder

The magnet holder
  1. Shield the threaded rod (1.25") from spatter by putting 2 nuts on it.
  2. Prop up the 1/4"x1"x(13" for monster)(9" for normal) flatbar so it's level with the center of the threaded rod, ensuring they are parallel.
  3. Weld the two together and remove one nut, leaving one in place. Be careful that it doesn't warp out of square.

Prepare the sensor holders

The normal sensor holders
The monster sensor holder

You will need one later which attaches to the arms, so it's suggested you make two. Its also included in the above materials.

  • For normal, weld 3.5" of rebar to 3.5" of threaded rod at a right angle, taking care to protect the threads from spatter. See image on right.
  • For monster, make one sensor holder like above, and one as shown on the left.

Thread a galvanized nut onto each.