CEB Press/Manufacturing Instructions/Frame with main cylinder: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
 
(49 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Template:CEB Press Manufacturing Instructions Navbox}}
{{Template:CEB Press Manufacturing Instructions Navbox}}
{{Warning|The documentation for the CEB Press is undergoing a thorough overhaul.  CAD models and written directions are presently obsolete.  For more information, see [[Talk:CEB_Press#Documentation_overhaul_in_progress]].  When the models, specifications and text on this article have been thoroughly reviewed, updated when necessary, and confirmed as whole and accurate, this warning may be removed.}}
{{Warning|The documentation for the CEB Press is undergoing a thorough overhaul.  CAD models and written directions are presently obsolete.  For more information, see [[Talk:CEB_Press#Documentation_overhaul_in_progress]].  When the models, specifications and text on this article have been thoroughly reviewed, updated when necessary, and confirmed as whole and accurate, this warning may be removed.}}
This page explains the assembly of the main frame. You need to complete [[CEB Press/Manufacturing Instructions/Main Cylinder Preparation| Main cylinder preparation]], all of the components in [[CEB Press/Manufacturing Instructions/Main Frame Preparation|Main Frame Preparation]], 2 [[CEB Press/Manufacturing Instructions/Leg Holders|Leg Holders]], and the [[CEB Press/Manufacturing Instructions/Soil loading drawer|Soil loading drawer]] before you can finish this step.
==Video Explantion ==
Note: This explanation is for an old prototype, but can still give you a good idea of how it works.
<html><embed src="http://blip.tv/play/AYHmjQYA" type="application/x-shockwave-flash" width="426" height="340" allowscriptaccess="always" allowfullscreen="true"></embed></html>


==Tools Required==
==Tools Required==
*Torch
*Torch
*Hole Punch
*Hole Punch
*Mag Drill
*Mag Drill with 3/4" and 1" dies
*1/2” Allen Wrench
*Spray paint
*Speed Square
*Big Square
*Various Wrenches
*Hammer
*Angle Grinder
*C-Clamps


==Materials Required==
==Materials Required==
*[[CEB Press/Manufacturing Instructions/Main Cylinder Preparation| The prepared main cylinder]]
* All of the components in [[CEB Press/Manufacturing Instructions/Main Frame Preparation|Main Frame Preparation]]
*[[CEB Press/Manufacturing Instructions/Leg Holders|Leg Holders]] (2)
*[[CEB Press/Manufacturing Instructions/Soil loading drawer|Soil loading drawer]]
*[[CEB Press/Manufacturing Instructions/Roller guides|Roller guides]]
===Steel===
===Steel===
*6” Heavy (7/16”) U-Channel- 274 1/2”
*6” Heavy (7/16”) U-Channel: (26" for monster, 18" for normal)
**A- (53” for Monster)(43" for normal) (2); Vertical Members
**(13” for Monster)(9" for normal)(2); Spacers  
**B- 20 3/4” (4); Horizontal Members
*2"x2"x1/4" Angle: 12"; Dirt Blockers: 6” (2)
**C- 28 3/4” (2); Drawer Members
*1 1/2” DOM Roundstock: 8 1/2”; Cylinder Pin (1)
**D- (13” for Monster)(9" for normal)(2); Spacers  
*For the "Monster" CEB: 6" Light (1/4") U-Channel-41.5"; Cylinder support: 20 3/4" (2)
**For the normal CEB: 2"x2"x1/4" Angle: 41.5"; Cylinder support: 20 3/4" (2)
*2"x2"x1/4" Angle: 23"; Dirt Blockers: 6” (2), Cylinder suport: 5.75" (2)
*1 1/2” DOM Roundstock: 12”; Cylinder Pin: 8 1/2”, Press Foot Filler: 3 1/2”
*1 1/2” Inter Diameter DOM Tubing: 2 1/2"; Pin Receptors:1 1/4” (2)
*1 1/2” Inter Diameter DOM Tubing: 2 1/2"; Pin Receptors:1 1/4” (2)
*1”x4” Plate: Lower Press Foot: 10” (1)
*1”x6” Plate: Upper Press Foot: 12” (1)
*3” U-Channel: 1.5” (2); Cylinder Spacers
*1” Pipe: 1.5” (2); Cylinder Spacers
*1/4”x1” Flatbar: (13” for Monster)(9" for normal) (1); Magnet holder
*3/8” Rebar: 3.5” (2); Sensor Holder
**For Optional “Jig”: 6”x12” Tubing: 52”
**For Optional “Jig”: 6”x12” Tubing: 52”


===Nuts and Bolts===
===Nuts and Bolts===
*3/4”x1.5” Bolts (28)
*3/4”x1.5” Bolts (28 normal, 32 super)
*3/4” x 2.5” Bolts (6)
**Horizontal members (16)
*3/4” Steel Nuts (9)
**Drawer members (8)
*3/4” Galvanized Nuts (40)
**Wide cylinder supports (4 normal, 8 super)
*3/4” Threaded Rod: (20.75” normal ceb) (35.75" monster ceb)
*3/4” Steel Nuts (2): Thin cylinder supports
**Magnet holder: 1.25"
*3/4” Galvanized Nuts (31 normal, 35 super)
**Sensor holders: 3.5" (2)
**Horizontal members (16)
**Thin cylinder support bolts: 6.25" (2)
**Drawer members (8)
**Monster CEB only: Drawer adjuster bolts: 3.75" (4)
**Wide cylinder supports (4 normal, 8 super)
 
**Thin cylinder supports: (2)
<!--Moving to main cylinder prep  ===Hydraulics===
**Sensor Holder: (1)
*5”x12” 3000 PSI Hydraulic cylinder [https://www.surpluscenter.com/item.asp?item=9-1143-12&catname=hydraulic Buy] (1)(This is for the super CEB.)
*1/2" Nut: Roller guides (2)
*5"x8" 3000 PSI Hydraulic cylinder (1) (This is for the normal CEB)
*1/2" washer: Roller guides (2)
*3/4” NPTM to 3/4” NPTM Hydraulic Coupler Elbow(2)
*1/2" Lock washer: Roller guides (2)
*3/4” Female Quick Coupler (1)
*3/4” Male Quick Coupler (1)-->


==Diagrams==
==Diagrams==
The holes in the horizontal members:<br/>
[[Image:horizontalholes.png|400px]]
<br/>
The holes in the drawer members:<br/>
[[Image:drawerholes.png|400px]]
<br/>
[[Image:monsterverticals.gif]]<br/>
[[Image:normalverticals.gif]]<br/>
[[Image:nutplacement.png]]<br/>
The lower press foot:<br/>
[[Image:lowerpress.jpg|400px]]
<br/>
The upper press foot:<br/>
[[Image:upperpress.png|400px]]
<html>
<html>
<iframe src="http://sketchup.google.com/3dwarehouse/mini?mid=20767b11ea7fd89cb38804396e417a9b&etyp=im&width=400&height=300" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" width="400" height="300"></iframe>
<iframe src="http://sketchup.google.com/3dwarehouse/mini?mid=20767b11ea7fd89cb38804396e417a9b&etyp=im&width=400&height=300" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" width="400" height="300"></iframe>
</html>
</html>
(model not completely done)
(model not completely done)
==Pre Assembly==
The following can be done in any order, prior to assembly.
===Prepare the horizontal members (B), vertical members (A) and the drawer members (C)===
The horizontal members only need holes punched. The drawer members need holes punched, and nuts welded to them. The vertical members only need holes torched in them.
====Punching====
[[Image:punchedholes.jpg|thumb|left|the punched holes]]
See the diagrams above for hole placement.
*In the '''horizontal members''', the holes are all 3/4" diameter. The holes should be 7/8” in from open side, or 19" apart, and as close as you can get them to the wall of the U-channel(''whats this approx?'' ''I think it's 1.25. It depends on your punch''). There are 4 holes in each piece.
*See the diagrams for the '''vertical members''' hole locations, as they vary between the "normal" and "monster" CEB's. They will need to be mirror images, but only one vertical will have the sensor hole.
* In the '''drawer members''', the holes are all 3/4" diameter. The holes should be 4 7/8” in from the long side, or 19" apart, and as close as you can get them to the wall of the U-Channel. There are 4 holes in each piece.
====Torching====
'''Vertical Members'''<br/>
The roller slots need to be torched. This is where the rollers bolt to the frame. See diagram.
*The center of them is located 9 5/16" away from the top of the machine, 2 inches in from one side of the U-Channel of the vertical members. This side must be the side which ejects the bricks. Label it so. Keep in mind the vertical members are mirror images of eachother, so don't make the same holes.
*They are to be 1.5" tall, and 5/8" wide.
*Grind away all slag.<br/>
'''Drawer Members'''<br/>
*Torch holes for 3/4" bolts as shown in the diagram.
*Grind away the slag.
====Welding====
[[Image:adjustmentnuts.jpg|thumb|Preparing to weld the adjustment nuts]]
'''Drawer Members'''
*Weld 3/4" nuts to the outside of the U channel where the holes are torched.
**Weld it with a bolt coming thru the other side so it protects the threads and so you know the nut won't get off center.
===Prepare the main cylinder===
====Prepare the press feet====
[[Image:lowerpressfoot.jpg|thumb||left|200px| The lower press foot]]
[[Image:upperpressfoot.jpg|thumb|200px| The upper press foot]]
#Mark and magdrill 13/16" holes in 1"x4"x10" plate for the lower press foot. They should be centered shortways, and 1" from the edge to the center of the holes long ways. See the diagram in the diagrams section.
#Place this centered on the 1"x6"x12" upper press plate and transfer punch the hole locations. Mag-drill these holes, again 13/16".
#Torch out a 4 1/4" x 2 3/4" rectangular hole in the lower press plate. Grind it smooth.
#Cut  two 2.5" pieces of 3/4" threaded rod.
{{Warning|The upper press foot NEEDS to be 12" across at the top of it (the side without the bolts sticking up) or there will be "fuzzy edges" on your bricks. See the quality control section on this page for more info. }}
<ol>
<li value="5">Plug weld the threaded rod into the upper press plate, so that the threaded rod is about 1/4" deep in the plate. Fill the hole with weld, then grind it flush.
</ol>
====Attach them to the cylinder====
#Expand the cylinder so the shaft is fully extended.
#*You can do this either by attaching a hydraulic hose between the ports, and pulling it manually (Requires a lot of muscle!) or by attaching it to some sort of hydraulic motor (We use our power cubes) and using a valve to do it.
#*You should attach quick-couplers to the cylinder for the fabrication process, so later steps like stretching the frame will be easier (you will hard-wire everything later). Attach an the elbow to each port with a quick coupler, one will be male, and the other female. It doesn't matter which.
#*The Prince brand cylinder uses a really large allen wrench for their plugs. If you can't find one, you can make one like we did. [[media:allentool.jpg]]
#Weld a 3.5" piece of 1.5" DOM roundstock inside of the tubing at the end of the shaft.
{{Warning|Take care that the top of the shaft doesn't get hot; there is a rubber seal between that and the cylinder that will melt and cause leaking if you're not careful. If it starts getting warm, dunk the shaft in water to cool it down.}}
<ol>
<li value="3">Stand the cylinder up vertically and support it using some sort of rope so it is as close to square vertically as possible. Another option is to prop it up using some sort of solid stand. [[Image:standingcylinder.jpg|thumb|The cylinder standing]].
<li>Place the tubing at the end of the shaft inside of the hole in the lower press foot.
<li>Insure the cylinder is square to the plate in all directions. See video.
<html><iframe width="560" height="315" src="https://www.youtube.com/embed//_pICqVpcZ8E" frameborder="0" allowfullscreen></iframe></html>
{{Hint|Since there is a lip on the cylinder, its hard to tell if its square unless you use two squares, one on the lip and against the other one which rests on the table}}
<li value ="5">Tack the lower press foot from all dimensions.
<li>Insure the cylinder is still square with it, if not, remove the tacks and fix it.
<li>Weld the two together on the top. There will need to be at least 2 layers of weld.
{{Warning| Dunk this frequently, even if the shaft is not getting hot! The plate will warp upwards and cause you lots of woe (trust me) if you do not.}}
<li value="8">Gather some press foot support pieces. We used scrap 1" plate torchings, but anything close to a  1"x1"x2.5" piece will do.
<li>Weld these as close as you can to the tubing and the press plate [[Image:pressplatesupports.jpg|thumb|the press foot supports]]
<li>Lower the hanging cylinder and flip it upside down.
<li>Fill in the bottom side of it with welds. This will require many layers of welds and many dunks to cool it.
<li>Grind it flush with the rest of the plate. A few spots where the welds are below the surface is OK, but the majority of the surface should be level.
<li>Put the upper press foot into the lower one and tighten nuts onto the threaded rod.
<li>Stand the cylinder up again and insure the press plate is still square with the cylinder.
<ul><li>If its not, you'll need to add shims between the two press plates until they are square with the cylinder
</ul></ol>
====Weld the magnet holder nut in place====
[[Image:magnetholdernut.jpg|thumb|Where to weld the magnet holder nut]]
*Weld the nut in the corner of the lower press plate, as shown. This should be on the opposite side of the ports of the cylinder, flush with the press foot, and as near to the corner as you can get it. It can even hang off a bit. Make sure you protect the threads.
===Prepare the wide cylinder supports===
[[Image:widecylindersuppmonster.jpg|thumb|left|The "monster" wide cylinder supports]]
[[Image:widecylindersuppnorm.jpg|thumb|The "normal" wide cylinder supports]]
#For the "Monster CEB," punch 3/4" holes in the thin U-Channel in the same manner as with the horizontal members (19" apart, 3/4" diameter)
#*For the "Normal CEB," torch 3/4" holes in the angle for the cylinder supports in the same manner as with the horizontal members.(19" apart, 3/4" diameter)
#Weld the 2"x2" angle (5.75") centered and squared on one side of the U-Channel.
#Torch a hole (3/4" for "normal") (1" for "monster") away from the end of the 2"x2" for a 3/4" bolt and grind it clean.
#Place a steel nut over the hole and insure it is clear for a bolt and flush.
#Weld the nut in place.
===Prepare the thin cylinder supports===
[[Image:thinsupports.jpg|thumb|The thin cylinder supports.]]
*Weld some 3/4" ID pipe (3/4" to 1") to the 3" U-channel, in the center. 4-8 good tacks is sufficient.
*Make some 6" long 3/4" bolts, by using a nut and 6.25" of threaded rod. See [[Making Bolts]].
===Prepare the magnet holder===
[[Image:magnetholder.jpg|thumb|left|The magnet holder]]
#Shield the threaded rod (1.25") from spatter by putting 2 nuts on it.
#Prop up the 1/4"x1"x(13" for monster)(9" for normal) flatbar so it's level with the center of the threaded rod, ensuring they are parallel.
#Weld the two together and remove the nuts. Be careful that it doesn't warp out of square.
===Prepare the sensor holders===
[[Image:sensorholders.jpg|thumb|The normal sensor holders]]
[[Image:monsterholder.png|thumb|left|The monster sensor holder]]
You will need one later which attaches to the arms, so it's suggested you make two. Its also included in the above materials.
*For normal, weld 3.5" of rebar to 3.5" of threaded rod at a right angle, taking care to protect the threads from spatter. See image on right.
*For monster, make one sensor holder like above, and one as shown on the left.


==Assembly==
==Assembly==


===Step 1: Mag Drill Holes in Verticals.===
===Step 1: Assemble horizontal members to vertical members.===
[[Image:Vertical_Beams.jpg|thumb|center|C-Clamp the vertical pieces to the jig as shown.]]
[[Image:Vertical_Beams.jpg|thumb|left|C-Clamp the vertical pieces to the jig as shown.]]
[[Image:First_Cross_Beams.jpg|thumb|left|Where to clamp the horizontals]]
[[Image:First_Cross_Beams.jpg|thumb|left|Where to clamp the horizontals]]
[[Image:clampedverticals.jpg|thumb|The verticals clamped in place with a horizontal clamped to them]]
[[Image:clampedverticals.jpg|thumb|The verticals clamped in place with a horizontal clamped to them]]
[[Image:horizsquare.jpg|thumb|Marking the location of the edge of the horizontal member on each side.]]
#Gather materials for the “Jig”; this means 6”x12” tubing (52”) and any extra heavy U Channel. If you don't have any laying around, you can use one drawer member, and one spacer on each side.
#Gather materials for the “Jig”; this means 6”x12” tubing (52”) and any extra heavy U Channel. If you don't have any laying around, you can use one drawer member, and one spacer on each side.
#Clamp the vertical pieces to the "Jig" on each end, with extra U channel in between the tubing and the vertical pieces. See the diagram on the right. Insure the two verticals are flush at the top end (the one with the roller slots). The slots and the thin cylinder support holes will need to align in the proper places with the cylinder later.
#Clamp the vertical pieces to the "Jig" on each end, with extra U channel in between the tubing and the vertical pieces. See the diagram on the right.  
#Clamp one horizontal member at each end of the jig. Make sure it is flush with the ends of the verticals.
#*Make sure they are both orientated properly, that is that both roller slots are at the same end of the jig.
#*Insure the two verticals are flush at the top end and(the one with the roller slots). The slots and the thin cylinder support holes will need to align in the proper places with the cylinder later.
#Clamp one horizontal member at each end of the jig. Make sure it is flush with the ends of the verticals and centered on them.
#*Ensure they are square with the jig by using a large square
#*Ensure they are square with the jig by using a large square
#*Clamp using 1 or 2 vise grips on either side.
#*Clamp using 1 or 2 vise grips on either side.
#Transfer Punch thru the holes on the horizontal members (B).
{{Hint|It really helps to label each member, so that if you end up unbolting the piece later, you'll know exactly where it goes and in what orientation. Mark which side will be the top of the machine, and which member goes where.}}
{{Hint|It really helps to label each piece before taking it apart, so that if you end up unbolting the piece later, you'll know exactly where it goes and in what orientation. Mark which side will be the top of the machine.}}
*Note: If you didn't need to use the drawer members for the jig, you can drill those and the wide cylinder support holes now too so you won't have to handle the material twice. See [http://opensourceecology.org/wiki/CEB_Press/Manufacturing_Instructions/Frame_with_main_cylinder#Step_2:_Mag-Drill_the_holes_for_the_wide_cylinder_supports_and_drawer_members below] for how to do it.
<ol><li value="5"> Mark where the edge of the horizontal member is in relation to the vertical members on the vertical member. Use a square to mark the same location on the opposite side. Do this on all four locations. See image.
<ol><li value="4">Use a Mag-Drill to drill the 3/4" holes each place where the horizontal members overlap the vertical members. Before drilling, double check that when the holes go thru the vertical members, they will be on the lip of the U-channel, not going into the wall, or off of the lip.
<li>Remove the horizontal members.
<li>Bolt the horizontal members tightly to the vertical members.
<li>Use a Mag-Drill to drill 3/4" holes in each spot you transfer punched.
<li>Flip the jig over so you have access to drill the other holes. See [http://www.youtube.com/watch?v=cwuQaTd2QZw video] for help.
<li>Flip the jig over so you have access to drill the other holes. See [http://www.youtube.com/watch?v=cwuQaTd2QZw video] for help.
<li>Align the other horizontal members with the marks you previously made, and insure once more that they are square.
<li>Clamp the other 2 horizontal members in place.
<ul><li>If it is on the mark on each side, but not square, just get it as close as you can to the marks while insuring it is square.</ul>
<ul><li>Align the other horizontal members with the ones below the jig, so that they are both at the same location relative to the vertical members. This is crucial so that the machine will stand up straight and there won't be any gap between the drawer and the top horizontal members.
<li>Clamp the members in place.
<li>Insure once more that they are square with the vertical members. </ul>
<li>Transfer punch them.
<li>Mag Drill (3/4") them.
<li>Remove them.
<li>Bolt them tightly to the vertical members.
<li>Mag Drill them.
<li>Double check to make sure everything is still square. If not, loosen the bolts and square it up on what you labeled top first and tighten those bolts. Then square out the other side and torch out any spots prohibiting the bolts from going thru. Bolt it back when you're done.
<li>Unclamp the verticals from the jig.
</ol>
</ol>


===Step 2: Assemble top/bottom===
===Step 2: Mag-Drill the holes for the wide cylinder supports and drawer members===
[[Image:frameassembly.jpg|thumb|left|Assembling the frame. Note: In this photo, the horizontal isn't flush with the verticals. They should actually all be ending at the same spot]]
#Loosely bolt the crossmembers on one side in place.
#Square them up with the verticals using a large square.
#*If they're not lining up properly square it up on what you labeled top first and tighten those bolts. Then square out the other side and torch out any spots prohibiting the bolts from going thru.
#Tighten all of those bolts.
#Flip over the frame.
#Loosely bolt the crossmembers on this side and square them. Insure the members on the other side are level with this one.
#Tighten these bolts.
 
===Step 3: Mag-Drill the holes for the wide cylinder supports and drawer members===
[[Image:drawermembers.jpg|thumb|Clamping the drawer members in their proper location for monster CEB]]
[[Image:drawermembers.jpg|thumb|Clamping the drawer members in their proper location for monster CEB]]
[[Image:clxdrawermembers.png|thumb|left|How to clamp the wide cylinder supports and drawer members]]
#Clamp the drawer member centered, (5" for standard CEB, 7" for the "super" CEB) from the upper cross member. The drawer slots should be on this side, not opposite. Make sure the nuts are facing where the drawer was, look at the picture.
#Clamp the drawer member centered, (5" for standard CEB, 7" for the "super" CEB) from the upper cross member. The drawer slots should be on this side, not opposite. Make sure the nuts are facing where the drawer was, look at the picture.
#Clamp the wide cylinder support directly below it. Make sure you mark where each one goes.
#Clamp the wide cylinder support directly below it. Make sure you label each component for re-assembly later.
#Transfer punch thru those holes.
#Mag-Drill 1" holes at these centers. Don't bolt these to the frame yet.
#Mag-Drill 1" holes at these centers.
#Flip the frame over and do the same thing on the other side.
#Flip the frame over and do the same thing on the other side.
===Step 3: Re-inforce the drawer members===
#Place the 1/2"x3"x24" flats on the drawer members as shown.
#Weld them in place, using about a 50% weld.


===Step 4: Tack the spacers===
===Step 4: Tack the spacers===
[[Image:spacerplace.png|thumb|left|Where to tack the spacers]]
[[Image:spacerplace.png|thumb|left|Where to tack the spacers]]
[[Image:clampedspacers.jpg|thumb|left|The spacers clamped to weld]]
[[Image:clampedspacers.jpg|thumb|right|The spacers clamped to weld]]
Note: You are only tacking them because when you stretch the frame, it may "move" their location. The spacers need to be contacting the drawer when you are pressing bricks, or the top edges of the bricks will be "fuzzy." See the quality control section for more info.
Note: You not welding them because when you stretch the frame, it may "move" their location. The spacers need to be contacting the drawer when you are pressing bricks, or the top edges of the bricks will be "fuzzy." See the quality control section below for more info.
#With the frame laid down, and one of the drawer members in place, place the spacers (U-channel, 13" for monster and 9" for normal) on each side. The end of them is to be "d" (7 1/16" for monster)(5 1/16" for normal) away from the upper cross member. Look at the diagram./
#With the frame laid down, and one of the drawer members in place, place the spacers (U-channel, 13" for monster and 9" for normal) on each side. The end of them is to be "d" (7 1/16" for monster)(5 1/16" for normal) away from the upper cross member. Look at the diagram./
#Insure they are parallel with the U-channel and C-clamp in two places for each.
#Insure they are parallel with the U-channel and C-clamp in two places for each.
Line 224: Line 106:
[[Image:dirtblockers.png|thumb|float|The dirt blockers.]]
[[Image:dirtblockers.png|thumb|float|The dirt blockers.]]
#Put the dirt blockers in place, between the vertical members, so the bottom side of them is about 1/8" above the bottom of the upper crossmembers.
#Put the dirt blockers in place, between the vertical members, so the bottom side of them is about 1/8" above the bottom of the upper crossmembers.
#Weld the portion inside of the vertical members, taking care to not weld it to the crossmembers.
#Weld the portion inside of the vertical members, taking care to not weld them to the crossmembers.


===Step 6: Fit the main cylinder===
===Step 6: Fit the main cylinder===
For more info, see the [http://www.youtube.com/user/marcinose#p/u/83/F9QAa7oHbiE video]. Also, there's a [http://makeprojects.com/Project/Fitting-the-main-cylinder/1414/1 page on Make Projects] that has more photos with the same instructions.
For more info, see the [http://www.youtube.com/user/marcinose#p/u/83/F9QAa7oHbiE video].  
#Lay the frame down, with all of the crossmembers and drawer members in place except the upper crossmember and drawer member which are facing up.
 
#Place the assembled cylinder lying down so that the press feet are between the spacers.
<html><script type="text/javascript"
#*The cylinder needs to be fully extended for this step. See "Attach them to the cylinder" earlier on this page for how to do this.
            data-dozuki-embed='3'
#*You need to insure that the vertical height is correct, and that the cylinder is centered. The top of the upper press foot should be (4 3/4" for the regular CEB, and 6 3/4" for the "super" CEB) away from the bottom of the upper crossmembers.
            src="http://cacher.dozuki.net/static/embed/ifixit-embed.3.js#id=1414&site=makeprojects.com">
{{Hint|To make sure the cylinder is centered, use a speed square pressed against the cylinder, and a tape measure to the vertical members as shown. [[Image:centercylinder.jpg|thumb]]}}
            </script> <p><a href="http://makeprojects.com/Project/Fitting-the-Main-Cylinder/1414/1">Fitting the Main Cylinder</a></p></html>
<ol>
<li value="3">Add a 1/8" spacer (big washers work great) under the cylinder, where it contacts the lower crossmember. This insures the cylinder is centered vertically.
<li>Use spray paint to mark the location of the tubing on the crossmember.
<li>Place the other upper crossmember in place, putting bolts thru the holes.
<li>Use spray paint to mark the location of the tubing on the crossmember.
<li>Remove this member and move the cylinder out of the way of the other.
<li>Place one of the DOM tubing pieces in the center of each of the sprayed marks and spray paint around this to mark where you will torch.
<li>Torch around the outside of the ring left by the DOM tubing.
<li>Insure the tubing will go thru each hole. If not, retorch it. Grind off the slag.
<li>Lay the cylinder back down and replace the top crossmember. Place the tubing in the torched holes.
<li>Insure the pin will go thru the tubing and the cylinder. If not, retorch the holes so that it will.
<li>With the pin held in, weld the tubing on the top in place (Youll want to tack it in many places before welding around it.). Then tack it as best you can on the back by hanging the frame off of the table and overhead welding.
<li>Remove cylinder and pin, as well as the two crossmembers.
<li>Fully weld the tubing on both sides. Jump around a lot to minimize any warping on the tube. Block the insides of the tubing so no spatter goes inside.
<li>Replace the crossmembers and the cylinder. Insure the pin still fits and hammer it thru.
</ol>


===Step 7: Fit the thin cylinder spacers===
===Step 7: Fit the thin cylinder spacers===
Line 254: Line 120:
#Verify that the hole for the cylinder spacers is at the right height.  
#Verify that the hole for the cylinder spacers is at the right height.  
#*Do so by putting the 6" bolts thru those holes and putting the spacer onto it. It should fit on the lip of the cylinder as shown.
#*Do so by putting the 6" bolts thru those holes and putting the spacer onto it. It should fit on the lip of the cylinder as shown.
#*If not, torch out where needs to be changed.
#*If not, torch it out so the bolt can be at the proper height.
#Weld the nuts for them in place on the inside of the frame. Protect the threads.
#Weld the nuts for them in place on the inside of the frame. Protect the threads.


Line 264: Line 130:
#Stand up the frame so the press feet are facing down.  
#Stand up the frame so the press feet are facing down.  
#Insert the [[CEB Press/Manufacturing Instructions/Soil loading drawer|Soil loading drawer]] on top of the horizontal members so that the press plate is facing the press feet.
#Insert the [[CEB Press/Manufacturing Instructions/Soil loading drawer|Soil loading drawer]] on top of the horizontal members so that the press plate is facing the press feet.
#*If the drawer doesn't fit because of the spacers, you welded them too close. Grind them off and weld them a little higher.
#*If the drawer doesn't fit because of the spacers, you welded them too close. Grind off the tacks and tack them a little higher.
#Position the drawer so that the press plate will be fully contacted by the press feet.
#Position the drawer so that the press plate will be fully contacted by the press feet.
#Bolt the drawer members on snugly.
#Bolt the drawer members on snugly.
Line 288: Line 154:
#Remove the other drawer member, and repeat steps 1-5.
#Remove the other drawer member, and repeat steps 1-5.


===Step 10:Fit the drawer members===
===Step 10: Fit the drawer members===
[[Image:rollerguideview.png|thumb|left|How to place in the roller guides]]
[[Image:rollerguideview.png|thumb|left|How to place in the roller guides]]
[[Image:drawershim.jpg|thumb|placing a cardboard shim]]
[[Image:drawershim.jpg|thumb|placing a cardboard shim]]
#Install the [[CEB Press/Manufacturing Instructions/Roller guides|Roller guides]] as shown in the illustration. One side should have a 1/2" spacer, and the other should have a 3/8" spacer plate. Tighten the bolt snug, but so that it can still move up and down.
 
#Replace the drawer as if you're going to stretch the cylinder again. Consult the photo above.
#Replace the drawer as if you're going to stretch the cylinder again. Consult the photo above.
#*Make sure the drawer members are loose to do so. You may need to hold them upwards as you push the drawer in.
#*Make sure the drawer members are loose to do so. You may need to hold them upwards as you push the drawer in.
Line 305: Line 171:
#Once the drawer is properly adjusted, tighten these bolts all the way.
#Once the drawer is properly adjusted, tighten these bolts all the way.


===Step 11:Install the remaining pieces===
===Step 11: Install the remaining pieces===
[[Image:magnetholdernut.jpg|thumb|left|Installing magnet holder.]]
[[Image:magnetholdernut.jpg|thumb|left|Installing magnet holder.]]
[[Image:cylspacerinplace.jpg|thumb|The cylinder spacer installed]]
[[Image:cylspacerinplace.jpg|thumb|The cylinder spacer installed]]
Line 312: Line 178:
#Install the sensor holder so the end of it (the furthest part from bolt) is overlapping the path of the magnet holder.
#Install the sensor holder so the end of it (the furthest part from bolt) is overlapping the path of the magnet holder.
#Bolt the wide cylinder supports to the frame. Put a 2" bolt with an extra nut thru the nuts on the top of the supports. Tighten these down so the cylinder is centered with pressure on each side. Tighten down the nut to lock it.
#Bolt the wide cylinder supports to the frame. Put a 2" bolt with an extra nut thru the nuts on the top of the supports. Tighten these down so the cylinder is centered with pressure on each side. Tighten down the nut to lock it.
#Loosely install the roller guides in their slots. The graphic showing washer locations is upside down! Look at the model photo for the proper orientation.
#*The roller guides should be able to rotate about their bolt, but should be able to resist moving from side to side.


===Step 12:Tighten all bolts===
===Step 12:Tighten all bolts===
Line 318: Line 186:
===Step 13: Weld the leg holders to the frame.===
===Step 13: Weld the leg holders to the frame.===
[[Image:legholderframe.jpg|thumb|Where to weld the leg holders]]
[[Image:legholderframe.jpg|thumb|Where to weld the leg holders]]
Position them on the upper horizontal member on the non-ejector side(Opposite side of roller guide holes. Weld them to the horizontal members. Insure they are square in all directions.
#Position them on the upper horizontal member on the non-ejector side(Opposite side of roller guide holes).
#Weld them to the horizontal members.  
#*Insure they are square in all directions.


=Quality Control=
=Quality Control=
Line 327: Line 197:
<html><iframe width="210" height="170" src="https://www.youtube.com/embed//mh7XqmTbA0g" frameborder="0" allowfullscreen></iframe>
<html><iframe width="210" height="170" src="https://www.youtube.com/embed//mh7XqmTbA0g" frameborder="0" allowfullscreen></iframe>
</html>
</html>
==Video Explantion ==
<html><embed src="http://blip.tv/play/AYHmjQYA" type="application/x-shockwave-flash" width="426" height="340" allowscriptaccess="always" allowfullscreen="true"></embed></html>

Latest revision as of 23:22, 16 December 2011

Warning.png Warning: The documentation for the CEB Press is undergoing a thorough overhaul. CAD models and written directions are presently obsolete. For more information, see Talk:CEB_Press#Documentation_overhaul_in_progress. When the models, specifications and text on this article have been thoroughly reviewed, updated when necessary, and confirmed as whole and accurate, this warning may be removed.

This page explains the assembly of the main frame. You need to complete Main cylinder preparation, all of the components in Main Frame Preparation, 2 Leg Holders, and the Soil loading drawer before you can finish this step.

Video Explantion

Note: This explanation is for an old prototype, but can still give you a good idea of how it works.

Tools Required

  • Torch
  • Hole Punch
  • Mag Drill with 3/4" and 1" dies
  • Spray paint
  • Speed Square
  • Big Square
  • Various Wrenches
  • Hammer
  • Angle Grinder
  • C-Clamps

Materials Required

Steel

  • 6” Heavy (7/16”) U-Channel: (26" for monster, 18" for normal)
    • (13” for Monster)(9" for normal)(2); Spacers
  • 2"x2"x1/4" Angle: 12"; Dirt Blockers: 6” (2)
  • 1 1/2” DOM Roundstock: 8 1/2”; Cylinder Pin (1)
  • 1 1/2” Inter Diameter DOM Tubing: 2 1/2"; Pin Receptors:1 1/4” (2)
    • For Optional “Jig”: 6”x12” Tubing: 52”

Nuts and Bolts

  • 3/4”x1.5” Bolts (28 normal, 32 super)
    • Horizontal members (16)
    • Drawer members (8)
    • Wide cylinder supports (4 normal, 8 super)
  • 3/4” Steel Nuts (2): Thin cylinder supports
  • 3/4” Galvanized Nuts (31 normal, 35 super)
    • Horizontal members (16)
    • Drawer members (8)
    • Wide cylinder supports (4 normal, 8 super)
    • Thin cylinder supports: (2)
    • Sensor Holder: (1)
  • 1/2" Nut: Roller guides (2)
  • 1/2" washer: Roller guides (2)
  • 1/2" Lock washer: Roller guides (2)

Diagrams

(model not completely done)

Assembly

Step 1: Assemble horizontal members to vertical members.

C-Clamp the vertical pieces to the jig as shown.
Where to clamp the horizontals
The verticals clamped in place with a horizontal clamped to them
  1. Gather materials for the “Jig”; this means 6”x12” tubing (52”) and any extra heavy U Channel. If you don't have any laying around, you can use one drawer member, and one spacer on each side.
  2. Clamp the vertical pieces to the "Jig" on each end, with extra U channel in between the tubing and the vertical pieces. See the diagram on the right.
    • Make sure they are both orientated properly, that is that both roller slots are at the same end of the jig.
    • Insure the two verticals are flush at the top end and(the one with the roller slots). The slots and the thin cylinder support holes will need to align in the proper places with the cylinder later.
  3. Clamp one horizontal member at each end of the jig. Make sure it is flush with the ends of the verticals and centered on them.
    • Ensure they are square with the jig by using a large square
    • Clamp using 1 or 2 vise grips on either side.


HintLightbulb.png Hint: It really helps to label each member, so that if you end up unbolting the piece later, you'll know exactly where it goes and in what orientation. Mark which side will be the top of the machine, and which member goes where.

  • Note: If you didn't need to use the drawer members for the jig, you can drill those and the wide cylinder support holes now too so you won't have to handle the material twice. See below for how to do it.
  1. Use a Mag-Drill to drill the 3/4" holes each place where the horizontal members overlap the vertical members. Before drilling, double check that when the holes go thru the vertical members, they will be on the lip of the U-channel, not going into the wall, or off of the lip.
  2. Bolt the horizontal members tightly to the vertical members.
  3. Flip the jig over so you have access to drill the other holes. See video for help.
  4. Clamp the other 2 horizontal members in place.
    • Align the other horizontal members with the ones below the jig, so that they are both at the same location relative to the vertical members. This is crucial so that the machine will stand up straight and there won't be any gap between the drawer and the top horizontal members.
    • Insure once more that they are square with the vertical members.
  5. Mag Drill (3/4") them.
  6. Bolt them tightly to the vertical members.
  7. Double check to make sure everything is still square. If not, loosen the bolts and square it up on what you labeled top first and tighten those bolts. Then square out the other side and torch out any spots prohibiting the bolts from going thru. Bolt it back when you're done.

Step 2: Mag-Drill the holes for the wide cylinder supports and drawer members

Clamping the drawer members in their proper location for monster CEB
How to clamp the wide cylinder supports and drawer members
  1. Clamp the drawer member centered, (5" for standard CEB, 7" for the "super" CEB) from the upper cross member. The drawer slots should be on this side, not opposite. Make sure the nuts are facing where the drawer was, look at the picture.
  2. Clamp the wide cylinder support directly below it. Make sure you label each component for re-assembly later.
  3. Mag-Drill 1" holes at these centers. Don't bolt these to the frame yet.
  4. Flip the frame over and do the same thing on the other side.

Step 3: Re-inforce the drawer members

  1. Place the 1/2"x3"x24" flats on the drawer members as shown.
  2. Weld them in place, using about a 50% weld.

Step 4: Tack the spacers

Where to tack the spacers
The spacers clamped to weld

Note: You not welding them because when you stretch the frame, it may "move" their location. The spacers need to be contacting the drawer when you are pressing bricks, or the top edges of the bricks will be "fuzzy." See the quality control section below for more info.

  1. With the frame laid down, and one of the drawer members in place, place the spacers (U-channel, 13" for monster and 9" for normal) on each side. The end of them is to be "d" (7 1/16" for monster)(5 1/16" for normal) away from the upper cross member. Look at the diagram./
  2. Insure they are parallel with the U-channel and C-clamp in two places for each.
  3. Tack them on this side in 3 spots. You may need to grind this off later, so make sure the tacks aren't longer than 1/4" or so.
  4. Flip over the frame and tack the other side.

Step 5: Weld the dirt blockers

The dirt blockers.
  1. Put the dirt blockers in place, between the vertical members, so the bottom side of them is about 1/8" above the bottom of the upper crossmembers.
  2. Weld the portion inside of the vertical members, taking care to not weld them to the crossmembers.

Step 6: Fit the main cylinder

For more info, see the video.

Fitting the Main Cylinder

Step 7: Fit the thin cylinder spacers

The cylinder spacer installed
  1. Verify that the hole for the cylinder spacers is at the right height.
    • Do so by putting the 6" bolts thru those holes and putting the spacer onto it. It should fit on the lip of the cylinder as shown.
    • If not, torch it out so the bolt can be at the proper height.
  2. Weld the nuts for them in place on the inside of the frame. Protect the threads.

Step 8: Stretch the frame

See the video.

Where to position the drawer for stretching.

Note: you need a hydraulic pump for this step.

  1. Attach the cylinder to a hydraulic pump or power cube and contract the cylinder at least 1".
  2. Stand up the frame so the press feet are facing down.
  3. Insert the Soil loading drawer on top of the horizontal members so that the press plate is facing the press feet.
    • If the drawer doesn't fit because of the spacers, you welded them too close. Grind off the tacks and tack them a little higher.
  4. Position the drawer so that the press plate will be fully contacted by the press feet.
  5. Bolt the drawer members on snugly.
  6. Use the pump to expand the cylinder as much as possible. The pump will likely stall out.
  7. If the pump stalls, turn it back on and expand it fully once more.
  8. Expand at least 3 times.
  9. Contract it, so you can weld the spacers in. Then detach from the pump.

Observations

  1. Remove the drawer members
  2. Look where the spacers are near the drawer. The spacers should be very close to the drawer.(less than 1/32"). See quality control below if you wonder why.
    • If they are too far, grind off the welds and position them so they are contacting the drawer. Yet again, make sure they are perfectly square with the verticals.
  3. Replace one drawer member and lay the frame back down on top of this drawer member.

Step 9: Weld the spacers

Where to weld on the interior
  1. Protect the drawer member on the bottom and the press foot so that when you weld, spatter won't stick. You could use some piece of metal or a nonflammable cloth.
  2. On the inside, bottom edge, weld the interior of the spacer inwards as far as you can. This should be an inch or more. Do this in all 4 corners accessable from this side of the frame. See the photo.
  3. Weld the top 100%.
  4. Grind the top weld flush with the U-channel.
  5. Loosely bolt the other drawer member in place.
  6. Flip over the frame.
  7. Remove the other drawer member, and repeat steps 1-5.

Step 10: Fit the drawer members

How to place in the roller guides
placing a cardboard shim
  1. Replace the drawer as if you're going to stretch the cylinder again. Consult the photo above.
    • Make sure the drawer members are loose to do so. You may need to hold them upwards as you push the drawer in.
    • Make sure the rails slide on the roller guides. You can check by putting bolts thru the nuts and making sure they have a lot of contact with the roller guides.
  2. Adjust the drawer members horizontally so the roller adjustment nuts welded to them are centered on the roller guides.
  3. Finger tighten the bolts on the drawer members, as they are sitting on top of the drawer.
  4. Try to slide the drawer in and out.
    • If the drawer gets stuck somewhere, investigate and find where it's hitting.
    • You'll probably need to loosen one of the drawer members and move it up a bit. This can be done uniformly using cardboard shims. See photo.
      • Place the shim between the drawer and the crossmember. Tighten the bolts again. Remove the shims by "jiggling" the drawer.
    • If it's hitting a spacer, grind down the spacer.
    • If the drawer itself is prohibitive in some spots, it wasn't grinded evenly. grind down the high spots.
  5. Once the drawer is properly adjusted, tighten these bolts all the way.

Step 11: Install the remaining pieces

Installing magnet holder.
The cylinder spacer installed
  1. Install the magnet holder onto the press foot. Make sure it's got an extra nut on it so you can lock its position. The flatbar needs to be parallel with the verticals. Lock it down with the nut.
  2. Install the thin cylinder supports by screwing the bolt in with an extra nut on it as shown, and placing the u-channel against the cylinder. Get both of them snug so the cylinder is centered with pressure on each side. Tighten down the nut to lock it.
  3. Install the sensor holder so the end of it (the furthest part from bolt) is overlapping the path of the magnet holder.
  4. Bolt the wide cylinder supports to the frame. Put a 2" bolt with an extra nut thru the nuts on the top of the supports. Tighten these down so the cylinder is centered with pressure on each side. Tighten down the nut to lock it.
  5. Loosely install the roller guides in their slots. The graphic showing washer locations is upside down! Look at the model photo for the proper orientation.
    • The roller guides should be able to rotate about their bolt, but should be able to resist moving from side to side.

Step 12:Tighten all bolts

  • Go back thru the frame and make sure all of the bolts are tight (except the roller guide bolts, that will be done later.)

Step 13: Weld the leg holders to the frame.

Where to weld the leg holders
  1. Position them on the upper horizontal member on the non-ejector side(Opposite side of roller guide holes).
  2. Weld them to the horizontal members.
    • Insure they are square in all directions.

Quality Control

  • The press foot must fit tightly within the compression chamber. Otherwise, the corners of bricks will not be clean as soil escapes from the compression chamber.
  • The compression chamber side spacers need to be even with the other sides of the chamber
  • Main cylinder adjusters cannot push against the cylinder in their native position. They are used to adjust the cylinder by the action of the bolt.
  • Here is a discussion: