CEB Press/Manufacturing Instructions/Leg Holders: Difference between revisions
Jump to navigation
Jump to search
(+warning) |
|||
Line 1: | Line 1: | ||
{{Template:CEB Press Manufacturing Instructions Navbox}} | {{Template:CEB Press Manufacturing Instructions Navbox}} | ||
{{Warning|The documentation for the CEB Press is undergoing a thorough overhaul. CAD models and written directions are presently obsolete. For more information, see [[Talk:CEB_Press#Documentation_overhaul_in_progress]]. When the models, specifications and text on this article have been thoroughly reviewed, updated when necessary, and confirmed as whole and accurate, this warning may be removed.}} | |||
[[Image:legholders.jpg|thumb|right|400px| The fabrication steps of the leg holders]]You will need 14 of these per machine. They are required for [[CEB Press/Manufacturing Instructions/Arms - secondary|Arms - secondary]] (8), [[CEB Press/Manufacturing Instructions/Feet|Feet]](4), [[CEB Press/Manufacturing Instructions/Frame with main cylinder|Frame with main cylinder]] (2) | [[Image:legholders.jpg|thumb|right|400px| The fabrication steps of the leg holders]]You will need 14 of these per machine. They are required for [[CEB Press/Manufacturing Instructions/Arms - secondary|Arms - secondary]] (8), [[CEB Press/Manufacturing Instructions/Feet|Feet]](4), [[CEB Press/Manufacturing Instructions/Frame with main cylinder|Frame with main cylinder]] (2) | ||
Revision as of 01:48, 24 September 2011
|
Warning: The documentation for the CEB Press is undergoing a thorough overhaul. CAD models and written directions are presently obsolete. For more information, see Talk:CEB_Press#Documentation_overhaul_in_progress. When the models, specifications and text on this article have been thoroughly reviewed, updated when necessary, and confirmed as whole and accurate, this warning may be removed.
You will need 14 of these per machine. They are required for Arms - secondary (8), Feet(4), Frame with main cylinder (2)
Tools Required:
- Torch
- Welder
- Grinder
Materials Required:
- 2 1/2” x 2 1/2" x 3/16" square steel tubing – 6” long (1)
- 3/4” nut (1)
- 3/4” x 2” bolt (1)
Fabrication Instructions:
- Torch a 3/4” hole in the center of one of the faces of the tubing; make sure it's large enough for a 3/4” bolt.
- Weld the nut over the hole, ensuring the nut is level, and the hole is clear. Make sure no spatter goes into the threads by covering the top of the nut.
- Thread the bolt into the nut.