Line 75: | Line 75: | ||
*Assisted on press foot fitting, setup of new welder; track chain size is incorrect and doesn't fit track welding jig - need to replace chain. | *Assisted on press foot fitting, setup of new welder; track chain size is incorrect and doesn't fit track welding jig - need to replace chain. | ||
*Shook down $60k donation - arriving this Thursday, and Kauffman Foundation will decide their grant on Sept. 13. Discussed this with Logan of TED Fellows program. | *Shook down $60k donation - arriving this Thursday, and Kauffman Foundation will decide their grant on Sept. 13. Discussed this with Logan of TED Fellows program. | ||
=August 30= | |||
*Published sawmill industry standard study video: | |||
<html><object width="400" height="233"><param name="allowfullscreen" value="true" /><param name="allowscriptaccess" value="always" /><param name="movie" value="http://vimeo.com/moogaloop.swf?clip_id=28369397&server=vimeo.com&show_title=1&show_byline=1&show_portrait=1&color=00adef&fullscreen=1&autoplay=0&loop=0" /><embed src="http://vimeo.com/moogaloop.swf?clip_id=28369397&server=vimeo.com&show_title=1&show_byline=1&show_portrait=1&color=00adef&fullscreen=1&autoplay=0&loop=0" type="application/x-shockwave-flash" allowfullscreen="true" allowscriptaccess="always" width="400" height="233"></embed></object><p><a href="http://vimeo.com/28369397">Dimensional Sawmill in Missouri</a> from <a href="http://vimeo.com/user2016419">Open Source Ecology</a> on <a href="http://vimeo.com">Vimeo</a>.</p> | |||
</html> | |||
*Wrote preliminary [[resource developer contract for Jerome Knapp]]. | |||
[[Image:4CEBs.jpg|thumb]] | [[Image:4CEBs.jpg|thumb]] | ||
[[Category:Logs]] | [[Category:Logs]] | ||
[[Category:Factor e Farm Logs]] | [[Category:Factor e Farm Logs]] |
Revision as of 21:28, 30 August 2011
August 18, 2011
- Today I gave a speech at TEDxKC
August 19, 2011
- Visited an industry standard Dimensional Sawmill with Brian Sweiger - we are having Sweiger Shop fabricate Prototype 1.
- Discussed Kickstarter with Isaiah and Found Alexander Lieders and Antoine Malouin to work with Isaiah on graphics
August 20, 2011
- Raised the 24x24' workshop covered space to near top with Brianna from 10PM to 5AM- for putting CEB production run in there
- Felled large walnut to clear workshop space

Clearing space for OSE Shop 2011
August 21
- 10 to 4 tieing down new covered space.
- Started Overall_Budget and published Kauffman Proposal
August 22
- 9-5 on the workshop roof - Mill Shed is officially complete, ready to populate with CEB presses, then sawmill
- Found that construction funding should be in within 48 hours
August 23
- Had design meeting on Dimensional Sawmill with Doug of Sweiger Shop
- Determined 'followthrough' and 'substance creation' as some of the core values for the FeF
August 24
- Troubleshooted and shot documentation on B&S Magnetos - to put in replacements
- Contacted Jose Bravo on joining the Factor e Team
- Updated CNC_Torch_Table#OSE_Project_Status.2FSchedule
- Updated CAD-CAM Problem Statement with discussion from Kevin Atkinson
- Wrote first cut of Senior TED Fellow application for 2012 - sorry, private at this point
- Filled in images at CEB_Press/Manufacturing_Instructions/Controller_Box#Wiring_Instructions
- Tom's Final Supper:
- Documented control code testing procedure for CEB press initial run - CEB_Control_Source_Code_v1.0_Explained
August 25
- Defined Instructionals To Do List and requested a comparable list from William Neal
- Spent an hour in Team Development coaching from SupporTED
- Spent an hour with Jershonda Baker defining Multimachine Deployment Strategy
- Spent 4 hours on controller code testing; issue with sensors not picking up signal
August 26
- Submitted Senior TED Fellows application for review
- Tested automated motion of secondary cylinder on CEB press.
- Set up Shonda to bend tracks for tractor; streamlined to 3 per minute:
August 27
- Tested secondary cylinder - see procedure. Result:
- Got up at the crack of dawn to write Factor e Farm Participation Standards after beginning group discussions on self-assessment and priorities toward a shared promise
August 28
- Moved CEB presses to new workshop area and installed arms on one
- Published first draft of GVCS Rollout Plan - general budget for GVCS deployment from now to completion.
August 29
- Published main cylinder wiring and testing procedure -CEB_Press/Manufacturing_Instructions/Control_Source_Code_v1.0_Explained#Main_Cylinder
- Identified Enniss Inc as subject mater experts with design experience of ironworker machines and well drilling rigs
- Assisted on press foot fitting, setup of new welder; track chain size is incorrect and doesn't fit track welding jig - need to replace chain.
- Shook down $60k donation - arriving this Thursday, and Kauffman Foundation will decide their grant on Sept. 13. Discussed this with Logan of TED Fellows program.
August 30
- Published sawmill industry standard study video:
Dimensional Sawmill in Missouri from Open Source Ecology on Vimeo.
- Wrote preliminary resource developer contract for Jerome Knapp.