Revision as of 03:42, 1 September 2011
August 18, 2011
- Today I gave a speech at TEDxKC
August 19, 2011
- Visited an industry standard Dimensional Sawmill with Brian Sweiger - we are having Sweiger Shop fabricate Prototype 1.
- Discussed Kickstarter with Isaiah and Found Alexander Lieders and Antoine Malouin to work with Isaiah on graphics
August 20, 2011
- Raised the 24x24' workshop covered space to near top with Brianna from 10PM to 5AM- for putting CEB production run in there
- Felled large walnut to clear workshop space

Clearing space for OSE Shop 2011
August 21
- 10 to 4 tieing down new covered space.
- Started Overall_Budget and published Kauffman Proposal
August 22
- 9-5 on the workshop roof - Mill Shed is officially complete, ready to populate with CEB presses, then sawmill
- Found that construction funding should be in within 48 hours
August 23
- Had design meeting on Dimensional Sawmill with Doug of Sweiger Shop
- Determined 'followthrough' and 'substance creation' as some of the core values for the FeF
August 24
- Troubleshooted and shot documentation on B&S Magnetos - to put in replacements
- Contacted Jose Bravo on joining the Factor e Team
- Updated CNC_Torch_Table#OSE_Project_Status.2FSchedule
- Updated CAD-CAM Problem Statement with discussion from Kevin Atkinson
- Wrote first cut of Senior TED Fellow application for 2012 - sorry, private at this point
- Filled in images at CEB_Press/Manufacturing_Instructions/Controller_Box#Wiring_Instructions
- Tom's Final Supper:
- Documented control code testing procedure for CEB press initial run - CEB_Control_Source_Code_v1.0_Explained
August 25
- Defined Instructionals To Do List and requested a comparable list from William Neal
- Spent an hour in Team Development coaching from SupporTED
- Spent an hour with Jershonda Baker defining Multimachine Deployment Strategy
- Spent 4 hours on controller code testing; issue with sensors not picking up signal
August 26
- Submitted Senior TED Fellows application for review
- Tested automated motion of secondary cylinder on CEB press.
- Set up Shonda to bend tracks for tractor; streamlined to 3 per minute:
August 27
- Tested secondary cylinder - see procedure. Result:
- Got up at the crack of dawn to write Factor e Farm Participation Standards after beginning group discussions on self-assessment and priorities toward a shared promise
August 28
- Moved CEB presses to new workshop area and installed arms on one
- Published first draft of GVCS Rollout Plan - general budget for GVCS deployment from now to completion.
August 29
- Published main cylinder wiring and testing procedure -CEB_Press/Manufacturing_Instructions/Control_Source_Code_v1.0_Explained#Main_Cylinder
- Identified Enniss Inc as subject mater experts with design experience of ironworker machines and well drilling rigs
- Assisted on press foot fitting, setup of new welder; track chain size is incorrect and doesn't fit track welding jig - need to replace chain.
- Shook down $60k donation - arriving this Thursday, and Kauffman Foundation will decide their grant on Sept. 13. Discussed this with Logan of TED Fellows program.
August 30
- Published sawmill industry standard study video:
Dimensional Sawmill in Missouri from Open Source Ecology on Vimeo.
- Wrote preliminary resource developer contract for Jerome Knapp.
August 31
- Published Proposal Template
- Cut materials for 4 hydraulic reservoirs and 4 fuel tanks for Power Cubes
- Picked up car from transmission repair; transmission went out again after 30 minutes