CEB Press/Manufacturing Instructions/Soil Shaker motor unit: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 10: Line 10:
== Materials Required ==
== Materials Required ==
[[Image:Shakermotor.png|thumb]]
[[Image:Shakermotor.png|thumb]]
*[https://www.surpluscenter.com/item.asp?item=9-7077-50&catname=hydraulic Buy]
*Shaker motor [https://www.surpluscenter.com/item.asp?item=9-7077-50&catname=hydraulic Buy]
*Thread tape
*Thread tape
*3/4" Dia x 36" or 48" long hydraulic hoses (2)
*3/4" Dia x 36" or 48" long hydraulic hoses (2)
Line 19: Line 19:
*3/4" to 3/4" male to male coupler (2)
*3/4" to 3/4" male to male coupler (2)
*3/4" T-style female elbow (has 3 ports) (1)
*3/4" T-style female elbow (has 3 ports) (1)
== Diagrams ==
== Diagrams ==



Revision as of 22:05, 7 October 2011

Warning.png Warning: The documentation for the CEB Press is undergoing a thorough overhaul. CAD models and written directions are presently obsolete. For more information, see Talk:CEB_Press#Documentation_overhaul_in_progress. When the models, specifications and text on this article have been thoroughly reviewed, updated when necessary, and confirmed as whole and accurate, this warning may be removed.

Shaker motor.jpg

Tools Required

  • Various Wrenches
  • Crescent Wrench

Materials Required

Shakermotor.png
  • Shaker motor Buy
  • Thread tape
  • 3/4" Dia x 36" or 48" long hydraulic hoses (2)
  • 1/2" Dia x 12" long hydraulic hose (1)
  • Hydraulic needle valve
  • 1/2" male to 1/2" female compression fitting coupler (1)
  • 1/2" to 3/4" female to male coupler (1)
  • 3/4" to 3/4" male to male coupler (2)
  • 3/4" T-style female elbow (has 3 ports) (1)

Diagrams

Fabrication Steps

  • Always wrap thread tape clockwise when facing the threaded portion. Thread tape is necessary between each connection unless otherwise stated.
  • Always keep the end caps on hoses and fittings until you need to take them off. They need to stay protected inside.