CEB Press/Manufacturing Instructions/Hopper sheet metal: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 16: | Line 16: | ||
== Diagrams == | == Diagrams == | ||
<!--- old design | |||
[http://openpario.mime.oregonstate.edu/attachments/463/hopper_sheet_metal.dxf DXF File] | [http://openpario.mime.oregonstate.edu/attachments/463/hopper_sheet_metal.dxf DXF File] | ||
[[Image:hopperfab.png|400px]] | [[Image:hopperfab.png|400px]] | ||
---> | |||
<html> | |||
<iframe src="http://sketchup.google.com/3dwarehouse/mini?mid=7227305826b439d6b38804396e417a9b&etyp=im&width=400&height=300" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" width="400" height="300"></iframe> | |||
</html> | |||
== Fabrication Steps == | == Fabrication Steps == |
Revision as of 03:42, 23 September 2011
|
Tools Required
- torch
- welder
- hole punch
Materials Required
- sheet metal 1/2”x12” - 7'2” ? 11 gauge, 5'x10' ?
- hinges
- 3/4" bolts
- 1/2" bolts
Diagrams
Fabrication Steps
- Plasma cut sheet metal
- Punch 3/4" holes in all 28 hinges, in center of rounded part
- Punch holes in hopper sheet metal (all the blue holes, 3/4")
- Bolt all hinges to sheet metal at the red locations marked "1" with 3/4" bolts
- Weld bottom hinges of hopper sheet 1 to hopper mount plate
- Weld top hinges of hopper sheet 1 to grate
- Install hopper supports to hold hopper sheet 1, and bolt with the 2 bolts (1/2")
- Weld hinges to hopper supports for sheet 2
- Weld hinges at base of sheets 2, 3, 4
- Weld hinges between sheets 3&1, 4&1, and between 2&3, and 2&4
- At this point, the entire hopper is erected. It remains to weld the remaining hinges to the grate.
- Upon completing these steps, the 3/4" bolts can be replaced with 1/2" bolts for successive deconstruction and reconstruction of the hopper.