CEB Press/Manufacturing Instructions/Soil Shaker motor unit
Jump to navigation
Jump to search
|
Warning: The documentation for the CEB Press is undergoing a thorough overhaul. CAD models and written directions are presently obsolete. For more information, see Talk:CEB_Press#Documentation_overhaul_in_progress. When the models, specifications and text on this article have been thoroughly reviewed, updated when necessary, and confirmed as whole and accurate, this warning may be removed.
Tools Required
- Various Wrenches
- Crescent Wrench
Materials Required
- Buy
- Thread tape
- 3/4" Dia x 36" or 48" long hydraulic hoses (2)
- 1/2" Dia x 12" long hydraulic hose (1)
- Hydraulic needle valve
- 1/2" male to 1/2" female compression fitting coupler (1)
- 1/2" to 3/4" female to male coupler (1)
- 3/4" to 3/4" male to male coupler (2)
- 3/4" T-style female elbow (has 3 ports) (1)
Diagrams
Fabrication Steps
- Always wrap thread tape clockwise when facing the threaded portion. Thread tape is necessary between each connection unless otherwise stated.
- Always keep the end caps on hoses and fittings until you need to take them off. They need to stay protected inside.