Seed Home 2 Utility Panel
  Module that houses utility connections for the Seed Home 2. |  | Specifications | 
|---|
 | Product Ecology | 
    
Part of Microhouse, Seed Eco-Home. Can use Tractor for earthworks, Cement Mixer, Sawmill for lumber, 3D Printer for 3D printed parts. | 
|---|
 | License | 
    
OSHWA and OSI compliant. CC-BY-SA-4.0 International, GPLv3, DIN SPEC 3105. | 
|---|
 | Water | 
    
Stubbed out to Sharkbite quick-connect shutoffs | 
|---|
 | Stub-out module | 
    
Drain, waste, and supply lines are stubbed into a monolithic frame for automatic positioning. | 
|---|
 | Waste | 
    
Bath, sink, and washer traps are prebuilt into foundation | 
|---|
 | Power/Gas Panel | 
    
Accepts gas meter, power meter, and interior breaker panel. | 
|---|
 | Construction | 
    
Describe basic construction technique and materials | 
|---|
 | Build Productivity | 
    
Designed so that panels + utility channel allow for 2 hour install of electricity, and Stub Module with panels allow 2 hr install of water, waste, and vent. | 
|---|
 | Completion Status | 
|---|
 | 
Describe whether built, prototyped, etc. Link to relevant Genealogy and Status of Completion. |  | Do you want more of this? Get Involved |  | v · d · e |  
 
 | 
Development
Concept
See Seed Home 2 Utility Panel Conceptual Design
More
- Sewer connection has 3 fees: one is excavation, 2 is permit, 3 is connection fee - which can be from $300 to $20k. Sewer near flint - [1] costs $3k for connection. Connection to sewer in Salem, Il - [2]  - $300. An incinerating toilet becomes a good idea - Incinerating toilet - [3] only $2k
 
Links