CEB Press/Manufacturing Instructions/Soil Shaker motor unit

From Open Source Ecology
Jump to navigation Jump to search

Warning.png Warning: The documentation for the CEB Press is undergoing a thorough overhaul. CAD models and written directions are presently obsolete. For more information, see Talk:CEB_Press#Documentation_overhaul_in_progress. When the models, specifications and text on this article have been thoroughly reviewed, updated when necessary, and confirmed as whole and accurate, this warning may be removed.

Shaker motor.jpg

Tools Required

  • Various Wrenches
  • Crescent Wrench

Materials Required

Note: NPT means national pipe thread, and refers to the interior diameter of the hoses. NPTM means a male end, and NPTF means a female end.

Shakermotor.png
  • Shaker motor Buy
  • Thread tape
  • 1/2" NPT Needle Valve (1)Buy
  • 1/4"x12" NPTM Hydraulic hose (1)Buy
  • 1/2"x36" NPTM Hydraulic hoses (2)
  • 1/2" NPT Hex Nipple (2) Buy


  • 3/4" Dia x 36" or 48" long hydraulic hoses (2)
  • 1/2" Dia x 12" long hydraulic hose (1)
  • 1/2" male to 1/2" female compression fitting coupler (1)
  • 1/2" to 3/4" female to male coupler (1)
  • 3/4" to 3/4" male to male coupler (2)
  • 3/4" T-style female elbow (has 3 ports) (1)

Diagrams

Fabrication Steps

  • Always wrap thread tape clockwise when facing the threaded portion. Thread tape is necessary between each connection unless otherwise stated.
  • Always keep the end caps on hoses and fittings until you need to take them off. They need to stay protected inside.