CEB Press/Manufacturing Instructions/Soil Shaker motor unit
Jump to navigation
Jump to search
|
Warning: The documentation for the CEB Press is undergoing a thorough overhaul. CAD models and written directions are presently obsolete. For more information, see Talk:CEB_Press#Documentation_overhaul_in_progress. When the models, specifications and text on this article have been thoroughly reviewed, updated when necessary, and confirmed as whole and accurate, this warning may be removed.
Tools Required
- Various Wrenches
- Crescent Wrench
Materials Required
Note: NPT means national pipe thread, and refers to the interior diameter of the hoses. NPTM means a male end, and NPTF means a female end.
- Thread tape
- Shaker motor Buy
- 1/2" NPT Needle Valve (1)Buy
- 1/4"x12" NPTM Hydraulic hose (1)Buy
- 1/2"x36" NPTM Hydraulic hoses (2)
- SAE 4M to 1/4" NPTF Swivel (1)Buy
- 1/2" NPT Hex Nipple (2) Buy
- 1/2" NPTF Tee (1) Buy
Diagrams
Fabrication Steps
- Always wrap thread tape clockwise when facing the threaded portion. Thread tape is necessary between each connection unless otherwise stated.
- Always keep the end caps on hoses and fittings until you need to take them off. They need to stay protected inside.