CEB Press/Manufacturing Instructions/Arms - secondary: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 13: Line 13:


*2 pieces 72" long - 4"x6"x3/8" angle steel
*2 pieces 72" long - 4"x6"x3/8" angle steel
*1 piece 3"x3"x1/2" steel
*[[CEB Press/Manufacturing Instructions/Leg Holders|Leg Holders]](8)
*[[CEB Press/Manufacturing Instructions/Leg Holders|Leg Holders]](8)



Revision as of 02:39, 18 September 2011

Main > Housing and construction > CEB Press > CEB press building instructions

Secondaryarms.jpg The secondary arms connect the primary arm/frame assembly to the legs to support the structure.

Tools Required

  • Cutting Torch
  • Angle Grinder
  • Welder

Materials Required

  • 2 pieces 72" long - 4"x6"x3/8" angle steel
  • 1 piece 3"x3"x1/2" steel
  • Leg Holders(8)

Diagrams

Front Arm

Back Arm

Fabrication Steps

see Leg Holders

  1. Clamp the leg holders in their proper locations (2 at each end, and 2 12" away from the end) and weld them in place.
  2. Clamp one angle iron arm to each side of the primary arms, the 6" side to the underside of the primary arms, with the 4" side facing outwards from the assembly.
  3. Torch thru the holes on the primary arms to make two 3/4" holes on each secondary arm.
  4. Clean up the torch slag with an angle grinder.