GVCS State of Completion: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
 
(21 intermediate revisions by the same user not shown)
Line 1: Line 1:
=May 2018=
=May 2018=
Note: 100% means machine is ready for productization or has been productized. This means at least stage 6 in the [[Stages of Product Release]]
[[Image:completionstatus2018.jpg|800px]]
[[Image:completionstatus2018.jpg|800px]]


==Available CAD==
==Available CAD==
*3D Printer - [[D3D v20.04.27]]
 
*3D Printer - [[D3D v20.04.27]]. [[D3D Universal]]. [[D3D Pro]]. [[D3D Universal v20.07]].
*Seed Eco-Home - [[Seed Eco-Home]] - [[Seed Eco-Home Index]] has all the full CAD in Sweet Home 3D
*Seed Eco-Home - [[Seed Eco-Home]] - [[Seed Eco-Home Index]] has all the full CAD in Sweet Home 3D
*Soil Mixer - [[Soil Mixer 2019]]
*Soil Mixer - [[Soil Mixer 2019]]
Line 10: Line 12:
*MicroTrac - [[MicroTrac_v17.10#CAD]]
*MicroTrac - [[MicroTrac_v17.10#CAD]]
*Trencher - [[Trencher#Latest_Work]]
*Trencher - [[Trencher#Latest_Work]]
*CNC Torch Table 2019 - [[CNC_Torch_Table_v19.10#CAD_1.22_Universal_Axis_-_3_Pieces]]
*CNC Torch Table 2019 - [[CNC_Torch_Table_v19.10#CAD_1.22_Universal_Axis_-_3_Pieces]]. 2017  - [[D3D_CNC_Torch_Table#CAD]]
*CNC Circuit Mill - [[D3D_CNC_Circuit_Mill#CAD_files]]
*Biodigester - see [[OSE_Part_Library]]
*Filament Maker - see [[OSE_Part_Library]]
*LifeTrac 6 - [[LifeTrac_6_Modules#LifeTrac_6_Full_Assembly]]
*Tracked Tractor - [[NextTractor#CAD]]
 
==Current Projects==
See active projects updated monthly at [[Current Projects]]
 
==Completed Build Guides==
*Tractor, CEB Press, Soil Pulverizer, Power Cube - see [[Civilization Starter Kit DVD v0.01]]
*3D Printer - [[3D Printer Build Manual]]
 
==Latest Work==
*Many of the machines are under active, iterative development. This will be the case until the end of 2028 - the completion date of the Global Village Construction Set.
*As we finish designs, we add them to the '''[[OSE Part Library]]'''
*You can see the latest versions for each machine at the [[Genealogies]] page. The prototypes built are listed with the latest on top.
*Do you want to get inolved? We follow [[OSE Specifications]], so if you can help us make our machines better, see [[Getting Involved]].
 
==Replications==
*We are aware of dozens of machine replications around the world. There may be many more that we don't know about, as we do not track downloads at this time.
*We expect viral uptake as we near GVCS completion and all prototypes are turned into full products by 2028.
*You can see existing replications by year at [[OSE Replications]]


=2016=
=2016=
Line 17: Line 42:
=January 2014=
=January 2014=
[[Image:completionstatus.jpg|800px]]
[[Image:completionstatus.jpg|800px]]
=2012=
*Here is an initial burndown as far as prototypes built when we could still count them, dated from 2012:
Note: All entries in this graph are hyper-linked. Click Edit below the graph and then click twice on each image to access the link.
<html><img src="https://docs.google.com/drawings/d/13KT0VcHtk93h_yF_y6SdvTQgkN8_FOaaDmBhyDGUfhs/pub?w=640&amp;h=460"></html>
[https://docs.google.com/drawings/d/13KT0VcHtk93h_yF_y6SdvTQgkN8_FOaaDmBhyDGUfhs/edit edit]


=Current=
=Current=
Line 24: Line 58:


=Links=
=Links=
*[[GVCS Status]]
*For a description of release status, see [[Stages of the Product Release]]
*[[GVCS Tools Status]]
*[[OSE Roadmap]]
*[[OSE Critical Path]]

Latest revision as of 12:11, 30 July 2021

May 2018

Note: 100% means machine is ready for productization or has been productized. This means at least stage 6 in the Stages of Product Release

Error creating thumbnail: File missing

Available CAD

Current Projects

See active projects updated monthly at Current Projects

Completed Build Guides

Latest Work

  • Many of the machines are under active, iterative development. This will be the case until the end of 2028 - the completion date of the Global Village Construction Set.
  • As we finish designs, we add them to the OSE Part Library
  • You can see the latest versions for each machine at the Genealogies page. The prototypes built are listed with the latest on top.
  • Do you want to get inolved? We follow OSE Specifications, so if you can help us make our machines better, see Getting Involved.

Replications

  • We are aware of dozens of machine replications around the world. There may be many more that we don't know about, as we do not track downloads at this time.
  • We expect viral uptake as we near GVCS completion and all prototypes are turned into full products by 2028.
  • You can see existing replications by year at OSE Replications

2016

Error creating thumbnail: File missing

January 2014

Error creating thumbnail: File missing

2012

  • Here is an initial burndown as far as prototypes built when we could still count them, dated from 2012:

Note: All entries in this graph are hyper-linked. Click Edit below the graph and then click twice on each image to access the link.

edit

Current

edit

Links