Marcin Log - April 2014

From Open Source Ecology
Jump to: navigation, search

Thu Apr 24, 2014

OSE Developer's Crash Course. Shop Manager. Extreme Research.

Wed Apr 23, 2014

CEB_Press_Extreme_Manufacturing_Workshop. Began on Universal Open Source Standards. Started Collaborator Survey. Scientific Equipment Workshop. Updated Getting Involved.

Tue Apr 22, 2014

Hydraulic Motors Construction Set. Velocar Collaboration.

Sat Apr 19, 2014

Sent Hospitality Leader offer letter. Bandwidth Management

Fri Apr 18

May Prep. Workshop Preparation Checklist. Updated Facebook Boost howto for finding summer students. Kliment Controller Design. 1030 Steel.

The Apr 17, 2014

Filament Winder - emailed, and found that design does not follow OSHWA OSH definition. Facebook Boost results. FeF PDC. Building CNC Torch Table Team. Started Source Files. Talked to Jose Gomez-Marquez on MIT OSE Club. Talked to Benjamin Koo on agriculture in China - social status farmer to Professional Farmer. Designing multidisciplinary hacker program at Tsinghua University.

Wed Apr 16, 2014

Product Realization Course Assessment. Notes on OSE + MIT from Jose. What Does it Cost to Build the GVCS?. Interviewed Hospitality Leader for the summer.

Tue Apr 15, 2014

[1] - OSE Books. Micro Power Cube.

Mon Apr 13, 2014

Flame Carburization for CEB Press press foot. Need to do calculations on abrasion resistance - metal requirements for open source brick presses.

Sun Apr 12, 2014

Worked with James Wise on CEB controller. See James Wise Log.

Sat Apr 11, 2014

Mental models exploration. Hab Lab Beds. Academic Papers. Wishlist of Metal 3D Printed Parts. Appropedia Merge.

Fri Apr 11, 2014

Michigan Tech University Lecture.

Thu Apr 10, 2014

Building Foundation Forms for MicroHouse 2 & 3.

Wed Apr 9, 2014

Yann's first version of CNC torch table - [2]. Second version - [3]. Height controller - 3rd picture here - [4]. Tilting motor trike - [5]. First tilting electric trike is Yann's work - cost is most interesting. All aluminum or carbon fiber composite. Cost for composite fibers - needs knowledge. Carbon fiber experience - 2 friends. Electrical Problem Statement - [6]. Bat management system - [7]. Industry Standards - [8]. Development (product) - Alpha (May-June) - Workshop (funding from Shuttleworth) (advance on energy pack bat mgmt - or cnc mill/torch) - Crowdfund (kit, for energy pack and machine dev) - Machines.

Daniel Goldberg via Jack Lerner via Adrew Rens - Schook, Hardy, and Bacon - [9] - Megan Roth in Pro Bono department. Big firm with 600 lawyers.

Foundation dug and leveled to +/- 2" over 26 feet of length, 6" of gravel spread on top. Ready for foundation forms.

Tue Apr 8, 2014

Please see our summer schedule - http://opensourceecology.org/wiki/Summer - and if you are interested in applying for a Dedicated Project Visit, please go to http://opensourceecology.org/wiki/DPV and fill out the application form - it should take 15 minutes. To sign up for the MicroHouse and CEB Press workshops - go to http://bit.ly/1lHE2fw. Register for the Microhouse at http://bit.ly/1kFLmqh , and for the CEB Press at http://bit.ly/1kFNfTT . Use Promo Code (bottom right of signup, then hit Apply) - Thank you for your application. The next step is the interview. Please let me know - are you available at _ on _ - CST Time USA? Please use the Conference Call number: http://opensourceecology.org/wiki/Conference_Call. Please fill out the streamlined application - http://bit.ly/1mYeVF5 - it should take no more than 15 minutes. One of the questions is the time frame - which would help OSE plan the summer better if we get that feedback from you now.

Foundation cut list. Finishing CEB 6 Visual Fabrication Diagram.

Mon Apr 7, 2014

New DPV Offer Letter. Instragram Marketing.

Sun Apr 6, 2014

Did a 3 week plan until the CEB Press Workshop. Email List.

Sat Apr 5, 2014

Finishing CEB 6 Visual Fabrication Diagram. Defined FreeCAD Requirements for OSE. Grading for MicroHouse 2 begun.

Fri Apr 4, 2014

Did a Reddit AmA. Troubleshooted that v4 Power Cube lost power on LifeTrac 6 from 3000 PSI to 1000 PSI - pump went bad. Replacing with a newer Power Cube.

Thu Apr 3, 2014

Continuing CEB 6 Visual Fabrication Diagram. Started 2014 Product Development Shedule.

Wed Apr 2, 2014

Carnegie Mellon Lecture.

Tue Apr 1, 2014

Mounted 6' bucket on LifeTrac for foundation work. Metal laid out for Soil Mixer welding.